Re: Exceedance letter
Please place Bob Fitzpatrick as an additional EPA recipient of any
e-mails you send to us in the future. His e-mail is included in the
cc list above. Please find below some questions with regards to the
exceedance letter for the silica exceedance that occurred on 2/16/06:
1. What was the conclusion drawn based on the inspection of the
engineering controls at the 21-23 Thames Street building?
2. The engineering controls at the 133-135 Greenwich Street building
must be inspected as well to ensure that there are no breaches in the
critical barriers since final clearance sampling has not been
conducted there yet.
3. Why did it take a week before the owner and its consultant were
made aware of the exceedance from the lab? The regulators were given
assurances by the owner and its consultant during a January 23, 2006
meeting that the sub-contract laboratories had been instructed to
provide immediate telephone notification of exceedances to the
Environmental Consultant Project Manager so that data processing and
transfer time would not delay notification.
4. Exactly what time and date were the owner and its consultant made
aware of the exceedance?
5. Exactly what time did work stop at the site today?
6. Was there any visible dust noticed on the bags being loaded out?
7. What is the condition of the ground area surrounding the Thames
Street bridge air station with regards to debris and dust? EPA has
informed the owner in the past that the Agency has observed
debris/dust/dirt under the air instruments at the ground level air
station location.
Thank you. Emmet.