NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

NYC-WTC_000436887

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000436887–000436888
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

V. HAZMAT SERVICES: The Consultant shall, through its Hazmat subconsultant, provide investigative and design services in connection with the removal of hazardous materials. Hazmat services shall be as set forth below. Payment for Hazmat services shall be in accordance with Article 7.4.

A. GENERAL: HAZMAT SUBCONSULTANT(“HS”)

1. In general, the (I IS) will provide services to the City through the Consultant by: • Conducting a comprehensive survey/assessment of the project site, • Preparing tlie abatement/remedial design documents for bidding, • Providing periodic project management services during abatement or remedial activities.

2. The Consultant shall be responsible for coordinating the services provided by the HS, including, without limitation, (1) incorporating into the Scoping Report, survey and assessment data compiled by the HS, and (2) incorporating into the final design plans and specifications prepared by the HS. 3. The HS’s work shall be performed in accordance with all current applicable. Federal, State and local regulations. Individuals performing these services shall hold all the necessary current licenses and certifications to perform such services. All individuals participating in the sampling of asbestos containing materials will hold both NYS DOL Asbestos Inspector and NYC DEP Asbestos Investigator licenses.

B. SURVEY/ASSESSMENT PHASE

Tire HS shall perform an environmental survey to determine the presence and location of hazardous materials including, but not limited to, asbestos containing materials (ACMs), lead-based paint (LBP), and similar environmental conditions, etc. This survey will include the following information: • A brief discussion of the services provided; • A written assessment of all hazards including cost of abatement or remedial work; • Sketches showing the approximate locations where samples were collected; • An estimate of tlie quantities and conditions of the hazards identified in tlie survey; • A summary of all samples, analyses, chain of custody and laboratory certifications; • Photographs, sketches, drawings, etc. as necessary to document the conditions.

flic HS shall perform a preliminary survey of the project site to note existing conditions and properly define the limits of accessible suspect hazards that may be disturbed, altered, demolished or affected by the proposed work. The I IS shall also be responsible to identify and locate any inaccessible suspect hazards and arrange for exploratory probes, physical penetrations, sample collection and analytical tests to determine whether these suspect hazards are present within the Scope of Work.

The HS will prepare an inventory of environmental hazards including but not limited to asbestos, lead, etc. The HS shall locate and describe all locations, areas, components, and materials in the existing building (facility) fabric or component which will be subject to disturbance, alteration, demolition or affected in any way as a result of the design it is preparing pursuant to this Contract. The EC shall supply this information to the City in a comprehensive environmental survey and assessment supported by annotated project plans or annotated sketches acceptable to the City.

C. Design phase

If the consultant determines that the hazards identified in the survey/assessment will be impacted by the project, or as otherwise directed by DDC, the Hazardous Materials Sub. Consultant (HS) will prepare plans, drawings and written design specifications as required to perform the remedial/abatement work and provide for temporary re-insulation, weather protection, etc. which may be indicated. These specifications must be fully developed in a format suitable for bidding and shall be included with the design documents for the project prepared by the Consultant.

CITY_21MC100_003997323

NYC-WTC_000436887

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000436887Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →