NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

Subject Paragraph Page

Arrangement of Charge in Hole---------- 5-2c 5-3 General Rock Removal------------------------- 5-3 5-4 Bench Blasting-------------------------------- ------- 5-3a 5-4 Spacing and Burden------------------------------- 5-3a(l) 5-4 Advantages of Inclined Blastholes - — 5-3a(2) 5-5 Lifters and Snake Holes------------------------ 5-3a(3) 5-6 Varying the Hole Array to Fit Natural and Excavation Topography---------------- 5-3a(4) 5-8 Charge Distribution-------------------------------- 5-3a(5) 5-11 Subdrilling------------------------------------------------ 5-3a(6) 5-11 Secondary Blasting-------------------------------- 5-3a(7) 5-12 Coyote Blasting, Trenching, and Cratering--------------------------------------------- 5-3b 5-12 Underwater Blasting------------------------------ 5-3c 5-13 Underwater Surface Shooting---------------- 5-3c(l) 5-14 Underwater Blasting in Drill Holes---- 5-3c(2) 5-14 Excavation for Control of Rock Surfaces------------------------------------------------ 5-4 5- 14 Presplitting---------------------------------------------- 5-4a 5-15 Design of the Pre splitting Layout-------- 5-4a(l) 5-15 Relation to Main Blast-------------------------- 5-4a(2) 5-19 Presplitting Horizontal and Vertical Corners-------------------------------------------------- 5-4a(3) 5-20 Horizontal Pre splitting---------------- - ------- 5-4a(4) 5-20 Smooth Blasting-------------------------------------- 5-4b 5-21 Line Drilling and Close Drilling---------- 5-4c 5-21 Precautions in Approaching Final Excavation Surfaces---------------------------- 5-4d 5-23 Blasting for Control of Rock Sizes----- 5-5 5-23 Riprap ------------------------------------------------------ 5-5a 5-24 -A-ggregate------------------------------------------------ 5-5b 5-24' Rock Fill for Dams-------------------------------- 5-5c 5-25

Chapter 6. MODIFYING BLASTING TECHNIQUES TO FIT GEOLOGICAL CONDITIONS Exploratory Study------------------------------------ 6-1 6-1 Rock Types------------------------------------------------ 6-2 6^1 Seismic Velocity-------------------------------------- 6-2a 6-1 Impedance-------------------------------------------------- 6-2b 6-2 Compressive and Tensile Strengths------ 6-2c 6-4 Density and Porosity-------------------------------- 6-2d 6-4 Fractures and Fabric------------------------------ 6-3 6-4 Joint Frequency---------------------------------------- 6-3a 6-4 Cushioning Joint Coatings---------------------- 6-3b 6-7

iii

CITY_21MC100_0 12669618

NYC-WTC_000435848

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435848Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →