Disassembled and cleaned work area (Action).
Engineering Controls
Action employed the following engineering controls during the removal of all ACM from
the work areas:
Isolated each work area per Contract Documents, and to the satisfaction of the on
site Project Monitor.
Constructed a three-stage decontamination unit with shower.
Installed HEPA-filtered negative pressure exhaust fans.
Engineering controls were inspected by ATC for compliance with all applicable
local, state, and federal rules and regulations.
Work Procedures
Measures to minimize the release of fibers during cleaning included:
Wetting of settled dust with water prior to disturbing.
Promptly placing removed settled dust in plastic bags for proper disposal.
Worker Protection
Workers who entered the work area during cleaning activities wore disposable protective
clothing (Tyvek suits) and proper respiratory protection including 1/2 face, air purifying
respirators with High Efficient Particulate Air (HEPA) filters.
Decontamination
Workers performed proper decontamination upon exiting each work area by:
Removing and disposing of protective clothing.
Removing and Rinsing respirator.
Showering.
Donning street clothing.
Disposal
Action placed asbestos-containing waste material in doubled and labeled impermeable
plastic bags and transported them to enclosed roll-off containers lined with polyethylene
sheeting for pickup and disposal.
Air Monitoring
ATC Project No. 15.22906.0002 Page 4