Executive Summary
ATC Associates Inc. (ATC) provided project monitoring, air sampling and management
serxhces for the interior dust clean-up activities for the unoccupied building located at
125 Cedar Street, New York, New York. Actual field operations were held from
September 12, 2002, with the collection of background wipe samples through November
1, 2002 with the completion of post testing. Background wipe samples for settled dust
were analyzed in accordance with the project specifications and the individual analytes
were as follows: Lead, Mercury, Poly Aromatic Hydrocarbons, and Dioxin. Clean-up
activities within the unoccupied building was conducted in accordance with generally
accepted industry practices, as well as the Project specification issued by the New York
City Department of Environmental Protection
Action Environmental Remediation, Inc., a New York State Department of Labor
(NYSDOL) licensed asbestos abatement contractor, performed the cleaning services.
ATC performed project monitoring, air sampling and management services for the
interior dust clean-up activities including; review of contractor worker certification.
Contractor oversight, daily collection and analysis of ambient and clearance air sampling.
Prior to the start of cleaning activities, ATC inspected that each area was under negative
air flow to ensure compliance with the project Scope of Work Procedures. Negative air
flow entailed the installation of negative air units within the apartments commercial
spaces and basement. As the clean-up project progressed, ATC continuously monitored
the Contractor’s work practices, generated daily site logs, and collected ambient air
samples in areas surrounding the abatement work areas. All ambient air samples
collected during this project were less than 70 structures per cubic centimeter as
specified, well below acceptable levels established by federal regulations (AHERA).
Once the Contractor completed cleaning activities from within all areas, in accordance
with project Scope of Work Procedures, ATC, NYCDEP and USEPA visually inspected
each work area to ensure the areas were decontaminated to a level of no visible debris.
Pollowing this successful final visual inspection, ATC performed final air and wipe
clearance sampling in accordance with project Scope of Work Procedures. Air clearance
sampling entailed collection of fiberglass air samples, analyzed via NIOSH method 7400
“B” counting rules, crystalline silica, analyzed via NIOSH 7500, as well as an EPA
modified Transmission Electron Microscopy (TEM) AHERA standard referred to as
PCMe. All TEM air samples were analyzed by ATC’s New York City laboratory, with
all sample results satisfying the accepted final air clearance criteria of less than or equal
to 0.0009 f/cc PCMe.
Clearance wipe sampling was performed consistent with generally accepted industrial
hygiene practices. There were inherent limitations created by operational and work practice
variability, variations in contaminant concentrations, and sampling and analytical accuracy.
The acceptable results of the sampling represent conditions found on the dates the samples
ATC Project No. 15.22906.0002 Page 2
CITY_21MC100_009480768
NYC-WTC_000435368
OCR can misread numbers and units. Confirm readings against the page image before using them.