NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 36 pages

WTC Tremolite fiber monitoring, 2000

Machine-extracted title · confidence 41%

Coordination and monitoring for asbestos-related Tremolite fiber sampling.

NYC-WTC_000435232–000435267
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EPA R8 Multimedia Asbestos Sampling: Libby,MT January 4, 2000

6. Specify Limits on Decision Errors

The null hypothesis that will be tested in Phase 1 is that indoor air levels in Libby are sufficiently high to warrant time-critical intervention. Two types of decision error are possible when making this decision:

Type I Error: Rejecting the null hypothesis when it really is true. That is, the site is declared to be below a risk level of 1E-03 when it is really above this level.

Type II Error: Accepting the null hypothesis when it actually is false. That is, the site is declared to be of time-critical concern when it actually is not.

The limits on these two types of errors are risk management judgements. In order to minimize the chances of a Type 1 error (a “false negative”), the decision will be based on the highest concentration of asbestos fibers detected in any currently-occupied residential or occupational building evaluated in the Phase 1 investigation. If one or more samples exceeds the 1 E-03 risk level, time critical action may be needed. However, additional samples may be collected to confirm the original measurement and to refine the risk estimate. Because of the time variability in asbestos levels in air, final decisions may be delayed until additional data have been collected, including data in the summer when airborne resuspension and transport of asbestos fibers in outdoor air is considered to be more likely than in winter.

7. Optimize the Design for Obtaining Results

Additional indoor and/or outdoor air samples may be collected and incorporated into either Phase 1 and/or Phase 2 as data become available on actual airborne exposure and risk levels.

Secondary Objective: Preliminary Investigation of Source Materials

Table 4 provides a summary of the seven-step DQO process for achieving the secondary objective. The following text describes each of the DQO steps in detail.

1. State the Problem

The problem to be addressed by this portion of the study is that most methods currently available for measuring asbestos in solid materials (e.g., soil, dust, bulk insulation, mine waste, etc.) are relatively insensitive, and it is not known whether impacts of historic or ongoing asbestos releases on these media can be detected by these techniques.

9

CITY_21MC100_009479260

NYC-WTC_000435243

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435243Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →