NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Stuyvesant HS environmental summary, 2002

Machine-extracted title · confidence 39%

Summary of work performed at Stuyvesant High School by environmental firms.

NYC-WTC_000435219–000435222
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2) Phase B: Reinstallation of horizontal and vertical unit ventilators by Mechanical Contractor after cleaning by the Environmental Contractor, Phase A cleaning Scope of Work, and approval by the SCA/BOE or their authorize representative.

Installation Work includes but is not limited to the following:

a) Install new close cell insulation for the unit ventilator front panel (rear) and rear of unit. Insulation per SCA design standards requirements. b) Check all components for satisfactory condition and re-install units. Provide caulking and gaskets between rear of unit and wall cavity to properly seal unit per SCA design standards. c) Reconnect electrical power to the unit ventilators from the electrical distribution panel and disconnect electrical supply. d) Reconnect unit ventilator to the chilled/hot water distribution system. e) Refill system with 40% solution Dow HD Frost Propylene Glycol solution. f) Reinstall unit in place and reseal per SCA design standards. g) Install new 4 ply pleated filters provided by school custodian. h) For Ceiling mounted unit ventilators - Patch and connect unit to ductwork after ductwork and unit ventilator has been cleaned. Provide new flexible connection between unit and ductwork per SCA design standards.

All duct and dust cleaning has been completed to date with the exception of minor punch list items and recharging of the Cilycol system & start up.

Remaining Work to Be Performed by TDX Subcontractors:

A. Clean miscellaneous areas on 1 st Fl. and wipe off all duct tape residue by 8/27 B. Refill system with Propylene Glycol by 8/27 and restart HVAC unit by 8/28. C. Principal office and conference room carpet EPA recommended Hot Water Extraction to be completed by 8/27. D. New auditorium carpet will be installed upon completion of abatement by TEH ‘s contractor. Carpet installer requires 7 days for installation.

CITY_21MC100_013074177

NYC-WTC_000435222

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435222Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000418887

Summary of environmental work at Stuyvesant High School; contractors and scope.

Similar indexed content

NYC-WTC_000418892

Summary of environmental work at Stuyvesant High School; contractors and scope.

Similar indexed content

NYC-WTC_000246075

Summary of environmental cleaning and testing at Stuyvesant High School.

Similar indexed content

Compare copies and versions →