Waste items from WTC cleanup, job 14528, Nov 2001

Machine-extracted title · confidence 28%

Custodial notes on handling unclaimed bags and pre/post-cleaning for WTC cleanup job 14528, with timeline for sub-cleaning and ventilation work.

NYC-WTC_000432680–000432681
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MEMO 11/29/2001 Details of the memo for job 14528: WTC CLEAN-UP CUSTODIAL STAFF. I SPOKE WITH THE CUSTODIAN AND I WAS ASKED TO HAVE THE CLEANING CONTRACTOR WET WIPE THE BAGS AND TO PLACE THEM IN THE AUDITORIUM. IF THEY ARE NOT CLAIMED THE CUSTODIAN WILL DISPOSE OF THEM. I INFORMED ERIC OF TDX THAT OUR PRE CLEANING, POST SAMPLING WITH RESULTS WILL BE COMPLETED BY THURSDAY 11-29-01.1 REQUESTED THAT HE INFORM THE GC SO THAT THE SUB CLEANING THE UNI VENTS CAN START ON FRIDAY MORNING 11-30-01. I SPOKE WITH THE GC AND HE TOLD ME THAT THE SUB CLEANING THE UNI VENTS WILL NEED 2 WEEKS. — Donald, Santo — Donald, Santo (11/27/2001) 11-26-01, PM AND 11-27-01 AM, SPOT INSPECTION. PRESENT FOR THE CHANGING OF THE SHIFTS FOR AIR TECH AND ATC. 11-26-01,75 % OF THE 5TH AND 4TH FLOORS COMPLETED BY THE FIRST SHIFT. SECOND SHIFT COMPLETED THE 25% LEFT AND STARTED THE 3RD FL. TODAY, DAY SHIFT WILL COMPLETE THE 3RD FLOOR AND THE BALANCE OF THE LANDINGS FROM 3RD TO THE 1ST FLORS. TODAY THE SECOND SHIFT WILL START THE 2ND FLOOR. THERE ARE APPROX. 25 CLEAR BAGS OF ITEMS TAKEN FROM THE STUDENTS LOCKERS BY THE CUSTODIAL STAFF. I SPOKE WITH THE CUSTODIAN AND I WAS ASKED TO HAVE THE CLEANING CONTRACTOR WET WIPE THE BAGS AND TO PLACE THEM IN THE AUDITORIUM. IF THEY ARE NOT CLAIMED THE CUSTODIAN WILL DISPOSE OF THEM. I INFORMED ERIC OF TDX THAT OUR PRE CLEANING, POST SAMPLING WITH RESULTS WILL BE COMPLETED BY THURSDAY 11-29-01. I REQUESTED THAT HE INFORM THE GC SO THAT THE SUB CLEANING THE UNI VENTS CAN START ON FRIDAY MORNING 11-30-01. I SPOKE WITH THE GC AND HE TOLD ME THAT THE SUB CLEANING THE UNI VENTS WILL NEED 2 WEEKS. — Donald, Santo — Donald, Santo (11/28/2001) 11-27-01 PM, CRAIG HNIS DID THE REQUIRED SPOT CHECK. TODAY IN THE AM I DID THE AM SPOT CHECK. 2ND FL IN THE PROCESS OF COMPLETION AND THE START OF THE FIRST FLOOR. ALL WORK IS ON SCHEDULE. THERE WERE APPROXIMATELY 30 COTS LEFT IN THE SCHOOL BY THE RED CROSS. I WENT TO THE RED CROSS HEADQUARTERS AND SPOKE TO THE MANAGER PHIL. HE IS HAVING THE COTS PICKED UP TODAY. I ALSO DISCUSSED WITH ATC ABOUT THE LOCATIONS OF THE PCM FOR AIR TESTING PERE FLOOR. — Donald, Santo (11/29/2001) 11-28-01, in the evening I was called by Janet (doing required spot check) and Remy Sanchez of ATC regarding fan rooms. Mohamed and Richard of the BOE were on site and asked if the 2 fan rooms on the first floor were cleaned. I was not aware of these fan rooms, the only fan rooms that were shown to me by TDX and the school foreman Sean was the the one on the Sth floor which is also called the boiler room. The Sth floor fan room is occupied partially by the roofers. I saw no need to pre clean this area because the roofers woulny make it dirty. It is to be done during the Surgical clean. After making numerous calls to and from the site, Alex and Air Tech Lab included. It was decided not to clean the fan rooms in rooms 130 and 134 at this time. Based on the information from Janet, ATC and the contractor the area is above a dropped ceiling and would have to be planked. I will do a further assessment with Hamid. Today. 11-29-01 Craig was on site in the am to Spot Check and to make sure ATC was following the sampling method and procedure that was discussed with Remy Sanchez of ATC. While there I asked Craig to identify any other "HIDDEN" locations inside the building that we were not shown originally. Craig reported the following: Rm 215 ductwork going to auditorium, dirty Rm 315 ductwork going to gym, dirty 1st fl Oil tank room, south west corner of the building, very dirty.

Outside the building; (TDX) ? Storage Room outside entrance, Charles street side. Gas meter room outside entrance, Warren street side.

After Fridays meeting we can address these locations and determine what should be ours or TDX responsibility to clean. Today I was asked by Tony Freyre, to have Air Tech Lab submit a full proposal cost estimate for the entire cleanup of the project. I do not have a problem with asking for this, but I would like to know exactly what the final cleaning scope of work is or will be. This would assist the contractor in presenting a fair and reasonable proposal. I did ask for this from the start of the project and was told that there is none. I will discuss this with Alex and Hamid. I did ask Air Tech to prepare a proposal for the work they have just completed. — Donald, Santo

CITY_21MC100_010234034

NYC-WTC_000432680

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432680Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →