NYC 9/11 Public Portal Document
MEMO 11/29/2001 Details of the memo for job 14528: WTC CLEAN-UP (11/20/2001) (11/20/2001) CREATING PROJECT PER ALEX LEMPERT'S REQUEST. — Jackeline, Paulino (11/20/2001) Today, C. Hnis and I did a visual assessment for the required clean up. We were with Sean, the custodial forman and Ernie from TDK. We also spoke with the roofer hired by TDX, who is removing the rocks and insulation. His expected time for completion of just the removal is Sunday 11/25/01, if there are no problems.There are issues that the school has regarding the cleaning of the Ducts and Uni Vents. I suggested to TDX to have a meeting with the Contractor (assigned to the cleaning of the Ducts and Vents) Sean the custodial foremen who is very very knowledge of the system, myself and TDX. The meeting is set for Wednesday 11/21/01 at 10;00am. I have also requested Air Tech Lab to meet me on site so that they can prepare themselves for the necessary man power and material for the clean up. — Donald, Santo (11/20/2001) Today, C. Hnis and I did a visual assessment for the required clean up. We were with Sean, the custodial forman and Ernie from TDX. We also spoke with the roofer hired by TDX, who is removing the rocks and insulation. His expected time for completion of just the removal is Sunday 11/25/01, if there are no problems.There are issues that the school has regarding the cleaning of the Ducts and Uni Vents. I suggested to TDX to have a meeting with the Contractor (assigned to the cleaning of the Ducts and Vents) Sean the custodial foremen who is very very knowledge of the system, myself and TDX. The meeting is set for Wednesday 11/21/01 at 10:00am. I have also requested Air Tech Lab to meet me on site so that they can prepare themselves for the necessary man power and material for the clean up. I will also have ATC present for the 2 meetings — Donald, Santo — Donald, Santo (11/20/2001) REQUEST MONITORING OVERRIDE FROM WARREN & PANZER TO ATC AS PER ALEX LEMPERT. — Donald, Santo (11/23/2001) WEDNESDAY 11-21-2001, I REQUESTED AND HAD A MEETING ON SITE WITH TDX, THE GC AND HIS VENTILATION CLEANING SUB, ATC AND THE CUSTODIAL FORMAN. I WANTED TO KNOW THE MEANS AND METHOD THAT WAS GOING TO BE APPLIED TO THE CLEANING OF THE UNI VENTS IN THE CLASSROOMS. FROM THE START, IT WAS VERY OBVIOUS TO ME THAT NO PREPERATION HAD BEEN MADE TO ADDRESS THIS VERY IMPORTANT ISSUE. AT MY REQUEST, I ASKED ERIC OF TDX TO UPDATE ALEX. TODAY I DISCUSSED THE ISSUE WITH ALEX. I WILL SPEAK TO ERIC TODAY REGARDING ALEX s SUGGESTED METHOD: FROM THE OUTSIDE OF THE BUILDING, USE A POWER BLOWER TO MOVE THE DUST MATERIAL INTO THE CLASS ROOM AND MAINTAIN AS MUCH DUST CONTROL AS POSSIBLE. ~ Donald, Santo (11/26/2001) ON SITE TODAY FOR THE START OF THE PRELIMINARY CLEAN UP. PRIOR TO THE START, I DISCUSSED WITH ATC REPS AND AIR TECH LAB SUPTS THE SCOPE OF WORK AND WHAT IS EXPECTED. THE GC WILL WORK 12 HOUR SHIFTS WITH APPROXIMATELY 25 WORKERS PER SHIFT. TODAY THEY WILL WORK BOTH THE STH & 4TH FLORS. I AS INFORMED BY H. SAVOJ, AS PER ALEX LEMPERT THAT THERE IS NO NEED TO HAVE OUR IH's AROUND THE CLOCK. JUST HAVE SPOT CHECKS IS WHAT I WAS INSTRUCTED TO DO FOR THIS PHASE. I ASKED ALEX WHAT TO DO ABOUT THE 2 SCHOOL GUARDS THAT ARE ON THE FIRST FLOOR. WHEN WE ARE NEARING THE FIRST FLOOR I AM TO LET HIM KNOW. I SPOKE WITH ERIC OF TDX TODAY AND THE 6TH FLOOR FAN ROOMS (BOILER ROOMS) ARE TO BE INCLUDED IN THE 2ND CLEANING PHASE. — Donald, Santo (11/27/2001) 11-26-01, PM AND 11-27-01 AM, SPOT INSPECTION. PRESENT FOR THE CHANGING OF THE SHIFTS FOR AIR TECH AND ATC. 11-26-01, 75 % OF THE 5TH AND 4TH FLOORS COMPLETED BY THE FIRST SHIFT. SECOND SHIFT COMPLETED THE 25% LEFT AND STARTED THE 3RD FL. TODAY, DAY SHIFT WILL COMPLETE THE 3RD FLOOR AND THE BALANCE OF THE LANDINGS FROM 3RD TO THE 1ST FLORS. TODAY THE SECOND SHIFT WILL START THE 2ND FLOOR. THERE ARE APPROX. 25 CLEAR BAGS OF ITEMS TAKEN FROM THE STUDENTS LOCKERS BY THE CUSTODIAL STAFF. I SPOKE WITH THE CUSTODIAN AND I WAS ASKED TO HAVE THE CLEANING CONTRACTOR WET WIPE THE BAGS AND TO PLACE THEM IN THE AUDITORIUM. IF THEY ARE NOT CLAIMED THE CUSTODIAN WILL DISPOSE OF THEM. I INFORMED ERIC OF TDX THAT OUR PRE CLEANING, POST SAMPLING WITH RESULTS WILL BE COMPLETED BY THURSDAY 11-29-01. I REQUESTED THAT HE INFORM THE GC SO THAT THE SUB CLEANING THE UNI VENTS CAN START ON FRIDAY MORNING 11-30-01. I SPOKE WITH THE GC AND HE TOLD ME THAT THE SUB CLEANING THE UNI VENTS WILL NEED 2 WEEKS. — Donald, Santo (11/27/2001) 11-26-01, PM AND 11-27-01 AM, SPOT INSPECTION. PRESENT FOR THE CHANGING OF THE SHIFTS FOR AIR TECH AND ATC. 11-26-01, 75 % OF THE STH AND 4TH FLOORS COMPLETED BY THE FIRST SHIFT. SECOND SHIFT COMPLETED THE 25% LEFT AND STARTED THE 3RD FL. TODAY, DAY SHIFT WILL COMPLETE THE 3RD FLOOR AND THE BALANCE OF THE LANDINGS FROM 3RD TO THE 1ST FLORS. TODAY THE SECOND SHIFT WILL START THE 2ND FLOOR. THERE ARE APPROX. 25 CLEAR BAGS OF ITEMS TAKEN FROM THE STUDENTS LOCKERS BY THE
CITY_21MC100_010234035
NYC-WTC_000432681
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000418809
Memo detailing Phase 1 and Phase 2 cleaning, PCM/ TEM monitoring logistics for a school project.
1 shared non-person entities · 1 shared topics · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420344
Memo detailing phases of preliminary and final interior cleaning at the school, including areas cleaned and monitoring.
1 shared non-person entities · 1 shared topics · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432634
Record describing phases of interior cleaning and lab monitoring for a school, with follow-up air monitoring after preliminary cleanup.
1 shared non-person entities · 1 shared topics · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420317
Memo summarizing Phase 1 and Phase 2 pre-cleaning and final interior cleaning for a NYC school under the W.T.C. M089-14528 project.
1 shared non-person entities · 1 shared topics · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437018
Phase 1 and Phase 2 pre-cleaning and surgical cleaning plan for WTC project floors; TEM air monitoring referenced.
1 shared non-person entities · 1 shared topics · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437074
SCA memo documenting pre-cleaning and post-cleaning phases at Stuyvesant HS site.
1 shared non-person entities · 1 shared topics · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107379
Detailed scope of work document for DEP-contracted asbestos abatement and cleaning of the interior of 125 Cedar Street.
1 shared non-person entities · 1 shared topics · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163248
EPA forwards fact sheets and access agreement forms for WTC cleanup program bidding process to DEP for distribution.
2 shared non-person entities · 1 shared topics · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107535
Form requesting DEP to perform cleaning and monitoring work at a specific apartment within 125 Cedar Street under the Federal Response Plan.
1 shared non-person entities · 1 shared topics · similarity 0.895
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161691
Notice for a mandatory pre-bid meeting regarding World Trade Center dust cleaning contracts and regulatory compliance requirements.
1 shared non-person entities · 1 shared topics · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107169
Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
1 shared non-person entities · 1 shared topics · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138766
EPA forwards fact sheets explaining cleanup responsibilities to DEP and other officials.
2 shared non-person entities · 1 shared topics · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000418809
Memo detailing Phase 1 and Phase 2 cleaning, PCM/ TEM monitoring logistics for a school project.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432634
Record describing phases of interior cleaning and lab monitoring for a school, with follow-up air monitoring after preliminary cleanup.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420344
Memo detailing phases of preliminary and final interior cleaning at the school, including areas cleaned and monitoring.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420317
Memo summarizing Phase 1 and Phase 2 pre-cleaning and final interior cleaning for a NYC school under the W.T.C. M089-14528 project.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437018
Phase 1 and Phase 2 pre-cleaning and surgical cleaning plan for WTC project floors; TEM air monitoring referenced.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437074
SCA memo documenting pre-cleaning and post-cleaning phases at Stuyvesant HS site.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000418809
Memo detailing Phase 1 and Phase 2 cleaning, PCM/ TEM monitoring logistics for a school project.
Similar indexed content
NYC-WTC_000420344
Memo detailing phases of preliminary and final interior cleaning at the school, including areas cleaned and monitoring.
Similar indexed content
NYC-WTC_000432634
Record describing phases of interior cleaning and lab monitoring for a school, with follow-up air monitoring after preliminary cleanup.
Similar indexed content
NYC-WTC_000420317
Memo summarizing Phase 1 and Phase 2 pre-cleaning and final interior cleaning for a NYC school under the W.T.C. M089-14528 project.
Similar indexed content
NYC-WTC_000437018
Phase 1 and Phase 2 pre-cleaning and surgical cleaning plan for WTC project floors; TEM air monitoring referenced.