Daily work force report, World Trade Center, Feb 2002

Machine-extracted title · confidence 28%

Day shift workforce and equipment for World Trade Center, Feb 2002.

NYC-WTC_000432591
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. >5,.*»OTAa«. vrtihwtof,*. N.Y, iiis?>(7)8>7a7.eo<» DATE- 2/3/02 MIGHT FINAL

DAILY WORK FORCE REPORT

Job Name 4 Location: World Trade Center Contract No. Weather Conditions;

Labor I Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 666 LOADER 1 PROJECT ENGINEER 1 CAT 366 GRAPPLER 1 OFFICE ENGINEER [cat 375 GRAPPLER 1 1 FOREMEN________________________________ 2 HITACHI 750 GRAPPLER ~ 1 SAFETY OFFICER HITACH11200 GRAPPLER 1 LABORERS 12 165 CFM COMPRESSOR SEE NOTE- IRON WORKERS 235 hammer hoe ram 1 LOCAL 14 4 MECHANICS TRUCK 1 1 LOCAL 15 7 TOOL TRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLLOFF IItEAMSTERS (I^UEL, trailer DELIVERY) 1 [dump trailers [[TEAMSTERS (FLaTBEDS, DUMPS, ANO EUKES) 14 Ieukes 4 MECHANICS 1 HIGH PECK TRAILERS ~ 7 HOUSE WRECKERS [welding TRUCK ~ FUELTRUCK ~ 1 [pickup TRUCKS . ~ 3 lIgHT TOWERS 5 DELIVERIES:______________________________ [SITE MULE ~ 3 •COMPRESSOR RAN DURING SHIFT UNMANNED- DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENEB. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

Description 0/Work: __________ _____________ ________________________________ COMPLSTEU WORK ___________________ __________________________________ _ fcONTINUEO TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. 36 MAINTAINED TRAFFIC FLOW INTO and OUT OF AREA RECORDED TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT: 101 __________________________________ YUKES: 166 DOT LOADS: 93_________________________________________________ _____ JI DELAYS: REcdVERV IN TOWER 1 SLOWED PRODUCTION DURING FIRST 3 HOURS: 1200 LOST 1HR 0200-0300

GRACE CONTRACTING CORP Approved By: BY: Titla: For GUPHRIKrgNDEHT t 04,028569

DAILY WORK FORCE REPORT0203N.xls

S M gBSSSS B ssssssa H ggsaassss CITY_21MC100_004198439

NYC-WTC_000432591

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432591Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →