.A GRACE CONTRACTING CORP. 15M5 6th Road, Whilestone. N.Y. 11357-(718) 767-9000 DATE: THURSDAY 12/27/01 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center lontract No. 'eather Conditions Windy & Cold
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE [SUPERINTEND^ 3 [[CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 [OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 375 GRAPPLER 1 SAFETY.OFFICER [[CAT 375 GRAPPLER 1 LABORERS 22 IHITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 e HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 1TOOLVAN ■ CAT 365 GRAPPLER 1 ■ DUMP TRAILERS ■ LOW BED TRAILER All mactiines worked in txjttom of piL 1200/375 - 1 were ■ HIGH DECK TRAILERS working around Vista digging into BS level. 1200 during ■ WELDING TRUCK the course of the night broke a hard line to the stick - this ■ FUELTRUCK 1 Iwas repaired an the 1200 went back to work worked until 4:30 ■ PICKUP TRUCKS 2 developed overheating problems. 375 early in the AM worked ■ LIGHT TOWERS 13 witti Gateway & pulled a chiller from the chiller room. 375 ■ SITE MULE 3 worked south of Vista - loading eukes. 750 was working | ■ DUMP TRUCKS north of the north wall tower 2 until it broke a hydraulic line ' 10 WHEEL DUMP TRUCK and was replaced with 375 - 2 ■ FLASHING ARROW BOARD 1 973 worked in bottom of pit loading eukes. ■ OFFICE TRAILER/GENER. 1 Tmcking summary on separate sheet ■ CARGO BOXES 3 ■ FLAT TRUCK ■ PUMP 2 ■ ROLLER ’ RAINMAKER/GENIE LIFT 1
Description of Work;
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA
GRACE CONTRACTING CORP Approved By; Titla:______ For: 1 04.028498 DAILY WORK FORCE REPORT1227N_xIs
-
CITY_21MC100_004198369
NYC-WTC_000432534
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280798
Night final daily workforce report for World Trade site, Dec 27 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290118
Night shift daily workforce and equipment counts for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280789
Night daily workforce record for World Trade site, Dec 21 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388407
Thursday night final daily workforce report for World Trade site; includes equipment.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266916
Night shift daily workforce report for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280127
Night shift daily workforce and equipment for World Trade site, Dec 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305344
Night final daily workforce log for World Trade Center site, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386661
Final night shift daily workforce sheet for World Trade Center project, December 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429731
Night shift daily labor/equipment listing for World Trade Center, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280861
Day final daily workforce report for Grace Contracting at World Trade Center, Mar 2002.
1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280798
Night final daily workforce report for World Trade site, Dec 27 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290118
Night shift daily workforce and equipment counts for World Trade Center site.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280789
Night daily workforce record for World Trade site, Dec 21 2001.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388407
Thursday night final daily workforce report for World Trade site; includes equipment.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419257
Night shift daily workforce and equipment at World Trade site, December 27, 2001.
Similar indexed content
NYC-WTC_000280798
Night final daily workforce report for World Trade site, Dec 27 2001.
Similar indexed content
NYC-WTC_000290118
Night shift daily workforce and equipment counts for World Trade Center site.
Similar indexed content
NYC-WTC_000280789
Night daily workforce record for World Trade site, Dec 21 2001.
Similar indexed content
NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similar indexed content