NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 27 2001

Machine-extracted title · confidence 45%

Night shift daily workforce and equipment at World Trade Center, Dec 27, 2001.

NYC-WTC_000432534
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

.A GRACE CONTRACTING CORP. 15M5 6th Road, Whilestone. N.Y. 11357-(718) 767-9000 DATE: THURSDAY 12/27/01 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center lontract No. 'eather Conditions Windy & Cold

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE [SUPERINTEND^ 3 [[CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 [OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 375 GRAPPLER 1 SAFETY.OFFICER [[CAT 375 GRAPPLER 1 LABORERS 22 IHITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 e HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 1TOOLVAN ■ CAT 365 GRAPPLER 1 ■ DUMP TRAILERS ■ LOW BED TRAILER All mactiines worked in txjttom of piL 1200/375 - 1 were ■ HIGH DECK TRAILERS working around Vista digging into BS level. 1200 during ■ WELDING TRUCK the course of the night broke a hard line to the stick - this ■ FUELTRUCK 1 Iwas repaired an the 1200 went back to work worked until 4:30 ■ PICKUP TRUCKS 2 developed overheating problems. 375 early in the AM worked ■ LIGHT TOWERS 13 witti Gateway & pulled a chiller from the chiller room. 375 ■ SITE MULE 3 worked south of Vista - loading eukes. 750 was working | ■ DUMP TRUCKS north of the north wall tower 2 until it broke a hydraulic line ' 10 WHEEL DUMP TRUCK and was replaced with 375 - 2 ■ FLASHING ARROW BOARD 1 973 worked in bottom of pit loading eukes. ■ OFFICE TRAILER/GENER. 1 Tmcking summary on separate sheet ■ CARGO BOXES 3 ■ FLAT TRUCK ■ PUMP 2 ■ ROLLER ’ RAINMAKER/GENIE LIFT 1

Description of Work;

CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA

GRACE CONTRACTING CORP Approved By; Titla:______ For: 1 04.028498 DAILY WORK FORCE REPORT1227N_xIs

-

CITY_21MC100_004198369

NYC-WTC_000432534

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432534Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →