GRACE CONTRACTING CORP. 151-45 fith Road. Whllcstono. N.Y. 11357-(718)767.0000 DATE: 3/5/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE ^SUPERINTENDENT 1 CAT966 LOADER 1 Iforemen 1 CAT 365 GRAPPLER 'ROJECT ENGINEER 1 ■ CAT 375 GRAPPLER SAFETY ENGINEER ' CAT 375 BUCKET iRERS 2 HITACHI 750 GRAPPLER IRON WORKERS ■ HITACH11200 GRAPPLER .OCAL 14 ■ 185 CFM COMPRESSOR .OCAL 15 1 235 HAMMER HOE RAM lARPENTER ■ MECHANICS TRUCK C/MTPENTER FOREMAN ■ TOOLTRUCK "7AMSTFRS (2 LO-BOYS. 1 FLAT) 3 ■ TOOL VAN MECHANICS ■ ROLL OFF HOUSE WRECKERS ■ DUMP TRAILERS ■ LOW BED TRAILER ' HIGH DECK TRAILERS ■ WELDING TRUCK DELIVERIES: ' FUEL TRUCK ' PICKUP TRUCKS 3 ■ LIGHT TOWERS ' SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES ■ FLAT TRUCK ■ PUMP
Descripton of V/ork; DEMOBILIZATION PHASE: COMPLETED WORK.______________________ t a CLEAN AND REMOVE CAT 235 HOE RAM FROM WTC JOBSITE TO WHITESTONE TRANSPORTED 1 CARGO BOX TO WHITESTONE ' ,CLEANED HITACH11200 W/CHISELS, POWER WASHER FROM ANGEL ARIEL
GRACE CONTRACTING CpRP j // _______ Approved By: JBY: 7 // / . Title: “ _____ / ' /'t y / I For. SUPERINTENOENT
DAILY WORK FORCE REPORT0305D.xls
CITY_21MC1OO_OO3918771
NYC-WTC_000280861
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000279981
Day/crew listings and equipment for World Trade Center construction.
1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290077
Day final daily workforce and equipment at World Trade Center site.
1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322584
Nightly preliminary workforce entry with equipment at World Trade Center site.
1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280100
Final daily workforce and equipment report for World Trade Center, Dec 12, 2001.
1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237644
Day shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 10, 2002.
1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280834
Night final daily workforce and equipment for World Trade Center job, Jan 24, 2002.
1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305471
Night final daily workforce and equipment for World Trade Center site, jan 27 2002.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305515
Day FINAL daily workforce and equipment for World Trade Center site, February 2002.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237663
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 20, 2002 day shift.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237693
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305499
Day preliminary workforce and equipment listing for World Trade Center site.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305490
Night shift daily workforce and equipment listings for World Trade Center site.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000279981
Day/crew listings and equipment for World Trade Center construction.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290077
Day final daily workforce and equipment at World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322584
Nightly preliminary workforce entry with equipment at World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280100
Final daily workforce and equipment report for World Trade Center, Dec 12, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237644
Day shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 10, 2002.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280834
Night final daily workforce and equipment for World Trade Center job, Jan 24, 2002.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000279981
Day/crew listings and equipment for World Trade Center construction.
Similar indexed content
NYC-WTC_000290077
Day final daily workforce and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000322584
Nightly preliminary workforce entry with equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000280100
Final daily workforce and equipment report for World Trade Center, Dec 12, 2001.
Similar indexed content
Day shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 10, 2002.
Similar indexed content