NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Mar 2002

Machine-extracted title · confidence 32%

Day final daily workforce report for Grace Contracting at World Trade Center, Mar 2002.

NYC-WTC_000280861
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 fith Road. Whllcstono. N.Y. 11357-(718)767.0000 DATE: 3/5/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE ^SUPERINTENDENT 1 CAT966 LOADER 1 Iforemen 1 CAT 365 GRAPPLER 'ROJECT ENGINEER 1 ■ CAT 375 GRAPPLER SAFETY ENGINEER ' CAT 375 BUCKET iRERS 2 HITACHI 750 GRAPPLER IRON WORKERS ■ HITACH11200 GRAPPLER .OCAL 14 ■ 185 CFM COMPRESSOR .OCAL 15 1 235 HAMMER HOE RAM lARPENTER ■ MECHANICS TRUCK C/MTPENTER FOREMAN ■ TOOLTRUCK "7AMSTFRS (2 LO-BOYS. 1 FLAT) 3 ■ TOOL VAN MECHANICS ■ ROLL OFF HOUSE WRECKERS ■ DUMP TRAILERS ■ LOW BED TRAILER ' HIGH DECK TRAILERS ■ WELDING TRUCK DELIVERIES: ' FUEL TRUCK ' PICKUP TRUCKS 3 ■ LIGHT TOWERS ' SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES ■ FLAT TRUCK ■ PUMP

Descripton of V/ork; DEMOBILIZATION PHASE: COMPLETED WORK.______________________ t a CLEAN AND REMOVE CAT 235 HOE RAM FROM WTC JOBSITE TO WHITESTONE TRANSPORTED 1 CARGO BOX TO WHITESTONE ' ,CLEANED HITACH11200 W/CHISELS, POWER WASHER FROM ANGEL ARIEL

GRACE CONTRACTING CpRP j // _______ Approved By: JBY: 7 // / . Title: “ _____ / ' /'t y / I For. SUPERINTENOENT

DAILY WORK FORCE REPORT0305D.xls

CITY_21MC1OO_OO3918771

NYC-WTC_000280861

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280861Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237644

Day shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 10, 2002.

Similar indexed content

Compare copies and versions →