NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Dec 7 2001

Machine-extracted title · confidence 38%

Final daily workforce report for World Trade Center site, Dec 7, 2001.

NYC-WTC_000432497
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE i CONTRACTING CORP. 151.4S6inRoap. mhilcstone, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 7, 2301 (DAY FINAL)

DAILY WORK FORCE REPORT

Ijob Name S Location; World Trade Center Contract Nd. [weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description i MZtNNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE i 1 OFFICE ENGINEER CAT 973 LOADER 1 foremen! CAT 365 GRAPPLER ! 1 [safety OFFICER 1 CAT 37S GRAPPLER 1 LABORERS! 19 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM, 1 TEAMSTERS 10 MECHANICS TRUCK 2 MECHANICS 2 TOOLTRUCK 1 HOUSE WRECKERS 6 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: AWISCO HIGH DECK TRAILERS i 2 ■ AUSTER RUBBER WELDING TRUCK t 1 FUEL TRUCK 1 PICKUP TRUCKS 3 light TOWERS ! 13 ■ SITE MULE 3 ■ DUMP TRUCKS ! ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 I CARGO BOXES 3 T FLAT truck" 1 T PUMP I 2 ROLLER t 1 IRAINMAKERJGENIE LIFT 1 [ ' 'r Description pt Work; I LOADS OUT: 60 YUKE LOADS 30 LOAD OUT STEEL AND DEBRIS MANNED TARPING AND TRIMMING STATIONS ! MANNED WATER STATIONS FOR DUST CONTROL ; MAINTAIN traffic FLOW IN ANO OUT OF AREA i CONTINUE [removing DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC’S ROADWAY j CONTtNUEjBURNING OF THE^SW CORNER COLUMN SEAMS j ELEVATIONS; ALL MACHINES LEVEL B-5 253

,pE CONTACTING CORP X 1 GRA( Approved B Title; BY: For: SUPERINTENDENT 04,028457___ I !I DAILY WORK FORCE REPORT 1207D.xls

CITY_21MC100_004198328

NYC-WTC_000432497

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432497Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000199927

Daily report from Grace Contracting Corp. listing workforce classifications and heavy equipment usage at the World Trade Center site.

Similar indexed content

Compare copies and versions →