Daily work force report, World Trade Center, Dec 7, 2001

Machine-extracted title · confidence 41%

Day shift daily workforce and equipment tally for World Trade Center, Dec 7, 2001.

NYC-WTC_000280091
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

i'

GRACE I CONTRACTING CORP. 1S)-45 6thRoafl, Whitestone, N Y 11357-(718) 767-9000 DATE: DECEMBER 7. 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

Job Name Location; World Trade Center Contract Np. Weather Conditions

Labor Equipmen; r CLASSIFICATION QUANT, Description MANNED STANDBY IDLE SUPERINTEiNDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN CAT 365 GRAPPLER 1 SAFETY OFiFICER 1 CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLE!^" 1 <ERS 1 HITACHI 550 GRAPPLER 1 LOCAL 141 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR^ 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAMF 1 TEAMSTERS 10 MECHANICS TRUCK I 2 MECHANICS__________ 2 TOOL TRUCK 1 HOUSE WRECKERS 6 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: AWISCO________ HIGH DECK TRAILERS 2 AUSTER RUBBER WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUC< FLASHING ARROW BOARD 1 OFFICE TRAII FR/GFNE ~ 1 CARGO BOXES 3 FLAT TRUCK j ' 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFt 1

Description )f Work: LOADS OU'': 60 YUKE LOADS 30 LOAD OUT Steel and debris MANNED TARPING AND TRIMMING STATIONS ~ MANNED Water stations for dust control ~________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ' CONTINUE [removing DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 jp MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATlOh S: ALL MACHINES LEVEL B-5 253

GRAIiQE con;tracting,corp/^ ] Approved By: Title: BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1207D.xls

CITY_21MC100_004484387

NYC-WTC_000280091

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280091Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000199927

Daily report from Grace Contracting Corp. listing workforce classifications and heavy equipment usage at the World Trade Center site.

Similar indexed content

Compare copies and versions →