Daily work force report, World Trade Center, Nov 28 2001

Machine-extracted title · confidence 32%

Final daily workforce and equipment report for World Trade Center, Nov 28, 2001.

NYC-WTC_000432475
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP, 151-43 din Road. VMestone. XK t:337-(7,8) 76?-9a(M DATE: MONDAY, NOVEMBER 25. 2001 DAY (FINAL)

DAILY WORK FORCE REPORT

jJcb Nam & Location: World Trade Center Contract No. Weather Conditions RAIN EARLY THEN MILD • DARK

Labor I Equipment CLASSIFlCAmW UANTIT Description MANNED standbYidle SUPERINTENDENT 2 [ICAT 966 LOADER 1 PROJECT ENGINEER 1 I CAT 446 BACKHOE 1 OFFICE ENGINEER jjCAT 973 LOADER I---- i---- ICAT365GRAPPLER ' FOREMEN__________ (SAFETY OFFICER laborers________ i |CAT375GRAPPLER IHITACHI750GRAPPLER ~ ~ 1

I IRON WORKERS HITACHI 550 6RAPPLER LOCAL 14_________ HITACHI 550 GRAPPLER 1 LOCAL 15_________ HITACH11200 GRAPPLER CARPENTER_______ CARPENTER FOREMAN TEAMSTERS MECHANICS HOUSE WRECKERS 2 11 _2_ 4 185 CFM COMPRESSOR MECHANICS TRUCK TOOL TRUCK___________ TOOL VAN_____________ ROLL OFF_____________ DUMP TRAILERS________ [ LOW BED TRAILER I 8

( HIGH DECK TRAILERS ' [ WELDING TRUCK ~ 1 FUEL TRUCK

I pCKUP TRUCKS" I LIGHT TOWERS ~ I PARTS TRUCK ~ ■ DUMP TRUCKS________ ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD ■ OFFICE TRAILER________ CARGO BOXES_________ ' FLAT TRUCK___________ 1 'pump ! (165' FOOT GENIE ~ '[ANGEL AERIAL(OUST SU^ 1 GENERATOR 60KW

Description of Work:____________ ______________________________________________________________ LOADS OUT: 140___________________________________________________________________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_____________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH________________________________ MANNED TARP NG AND TRIMMING STATIONS____________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________________________________________ MAiNTAiN TRAFFIC FLOW IN AND OUT OF AREA________________________________________ _ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2___________________________ DELAYS: 1 HR (12:00-1 ■.00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA__________ 3 HOURS WITH GATEWAY 550 & GRACE 750 AT NfE CORNER OF TOWER 2 CORE WHILE SEARCH AND recovery FOR FIREFIGHTERS WAS CONDUCTED

GRACE CONTRACTING CORP

rTiHe: BT2_________ 04,028435 por SUPERINTENDENT

CITY_21MC100_004198306

NYC-WTC_000432475

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432475Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →