NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗Notices of exceptions and responsibility limits for utility work.
NYC-WTC_000432245
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GENERAL EXCEPTIONS: RE; ALL WORK REQUIRING STREET EXCAVATIONS
Due to the possibility of underground utilities, existing water mams, pipe lines, liber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatenng removal of existing soil determined " NOT SUIEVBLE FOR BACKFILL " by the NYCDOT or NYCDEP and furnishing suitable soU, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utihtie: and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for the: utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.
In the event a change order is required and can not be negotiated at the time it is discovered and we art required to close up any excavations, there will be an additional charge for remobilization of our forces when an agreed change order has been signed both parties.Please be aware the job will not continue until the additional work authorization is signed.
Contractor; JCC CONS! RUCTION CORPORATION Contractor Signature; JUavia Lanmzzaro “ Print Name & Title: David Cannizzaro/President Date:
Agreed & Accepted by: Print Name & Title; Date:
12.Q03261
CITY_2 IMCl 0 0_Ci 0116 2 9 3 9 NYC-WTC_000432245
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432244
Contractor notes on utilities relocation and backfill obligations.
1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356980
Bid to perform materials and labor for listed World Trade Center works.
1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251953
Alternate proposal for WTC Recovery including sand removal and site improvements.
1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290803
Proposal to remove/replace sand and soil, railing, and other improvements at World Trade Center Recovery project.
1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267052
JCC Construction Corp. proposal to perform specified site work for World Trade Center Recovery.
1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386478
Project work order for World Trade Center water analyses and related tasks.
1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000251947
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
Similar indexed content
NYC-WTC_000432244
Contractor notes on utilities relocation and backfill obligations.
Similar indexed content
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
Similar indexed content
NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
Similar indexed content
NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
Similar indexed content