Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Night shift workforce and equipment details for World Trade Center site, Dec 2001.

NYC-WTC_000429744
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

G ACE CONTRACTING CORP. 151 IBthRoad, Whitestone. N.Y. 11357-(718) 767-9000 DATE: SATURDAY 12/29/01 NIGHT FINAL

F= DAILY WOF K FORCE REPORT

Joi (lame & Location: World Trade Center Co ract No. We :tier Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IE .E SU ^RINTENDENT 2 CAT 966 LOADER 1 PR JECT ENGINEER 1 CAT 446 BACKHOE 1 OF CE ENGINEER CAT 973 LOADER 1 E2 EMEN 2 CAT 375 GRAPPLER 1 SA ETY OFFICER CAT 375 GRAPPLER 1 LAI 3RERS 21 HITACHI 750 GRAPPLER 1 IRC J WORKERS HITACHI 550 GRAPPLER 1 LO ALU 5 HITACHI 550 GRAPPLER 1 LO AL 15 6 HITACHI 1200 GRAPPLER 1 CA PENTER 185 CFM COMPRESSOR 1 CA PENTER FOREMAN 235 HAMMER HOE RAM 1 TE vISTERS 1 MECHANICS TRUCK 1 1 KI HAN ICS 1 TOOL TRUCK HO SE WRECKERS 8 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER GA EWAY USING CAT 365 GRAPPLER START NG AT 9PM HIGH DECK TRAILERS

Ih FL^ r TRAILER (PLATE 02 07486) FROM TRUCH 71 ________ IRREPARABLY DAMAGED AT PIBR 6 DE t\Y: LOST TWO HOURS WITH 5 TRUCKS ^C OF WELDING TRUCK FUEL TRUCK PICKUP TRUCKS 1 2 ________ REDIRECTION TO HAMILTON E BY GPS LIGHT TOWERS 13 MONITORS. TRUCKS UNABLE T 0 DUMP AT SITE MULE 3 HAMILTON, REDIRECTED BACK TO PIER 25. DUMP TRUCKS ____________ AMEC UNABLE TO LOAD DURINI5 THIS TIME 10 WHEEL DUMP TRUCK DUE TO TRUCK SHORTAGE. FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER » RAINMAKER/GENIE LIFT 1

Des|cription of Work:_________________________________________________________________________ CO. vIPLETED WORK: JTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL ~~

GRACE CONTRACTING CORP Apf roved By. Tint : For SUPERINTENDENT

DAILY WORK FORCE REPORT1229N.xls

Q2.2Q681Q CITY_21MC100_0 04145151

NYC-WTC_000429744

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429744Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →