Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 37%

Night daily workforce report for World Trade Center; includes equipment list.

NYC-WTC_000291320
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

G ACE CONTRACTING CORP. 151 i 6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: SATURDAY 12/29/01 NIGHT FINAL

DAILY WOF K FORCE REPORT

Joi 'Jame & Location: World Trade Center Co ract No. We :her Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IC .E SU ERINTENDENT 2 CAT 966 LOADER 1 PR JECT ENGINEER 1 CAT 446 BACKHOE 1 OF CE ENGINEER CAT 973 LOADER 1 FO EMEN 2 CAT 375 GRAPPLER 1 SA 5TY OFFICER CAT 375 GRAPPLER 1 LAI 3RERS 21 HITACHI 750 GRAPPLER 1 IRC ^1 WORKERS HITACHI 550 GRAPPLER 1 LOI AL 14 5 HITACHI 550 GRAPPLER 1 LO AL 15 6 HITACHI 1200 GRAPPLER 1 CA PENTER 185 CFM COMPRESSOR 1 CA PENTER FOREMAN 235 HAMMER HOE RAM 1 TE, l/STERS 1 MECHANICS TRUCK 1 1 ME HANICS__________ 1 TOOL TRUCK HO SE WRECKERS 8 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER GAl EWAY USING CAT 365 GRAPPLER STARTI MG AT 9PM HIGH DECK TRAILERS FL/ r TRAILER (PLATE 02 07486) FROM TRUCk 71 WELDING TRUCK IRREPARABLY DAMAGED AT PIE R 6 FUEL TRUCK 1 DE ^Y: LOST TWO HOURS WITH 5 TRUCKS B C OF PICKUP TRUCKS 2 ________ REDIRECTION TO HAMILTON A\ 5 BY GPS LIGHT TOWERS 13 MONITORS. TRUCKS UNABLE T ) DUMP AT SITE MULE 3 HAMILTON. REDIRECTED BACK COPIER 25. DUMP TRUCKS AMEC UNABLE TO LOAD DURINt 3 THIS TIME 10 WHEEL DUMP TRUCK DUE TO TRUCK SHORTAGE. FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1 I

Description of Work:_______________________________________________________________________________ CO ^PLETED WORK:_____________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MABMTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL ”

GRACE COI ACTING CORP Apf roved By: Titl«: For SUPERINTENDENT

I I DAILY WORK FORCE REPORT1229N.xls

CITY_21MC100_004964431

NYC-WTC_000291320

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291320Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →