NYC-WTC_000429469OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 2/12/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor CLASSIFICATION QUANT. c Equipment Description MANNED STANDBY IDLE SUPERINTENDENT CAT966 LOADER 2 1 FOREMEN 1 CAT 365 GRAPPLER 1 PROJECT ENGINEER CAT 375 BUCKET 2 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS HITACHI 750 GRAPPLER 14 1 IRON WORKERS HITACH11200 GRAPPLER 1 LOCAL 14 4 185 CFM COMPRESSOR •SEE NOTE LOCAL 15 5 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN 1 TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 2 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES: WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 NOTE: 185 CFM COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5 lIsiTE MULE 2 14 TEAMSTERS {10 DUMP TRAILERS, 4 EUKES ) DUMP TRUCKS 10 WHEEL DUMP TRUCK •NOTE: TRUCK 63 WAS BEING FILLED WITH DIRT FROM THE FLASHING ARROW BOARD TRENCH WORK AT LIBERTY & WEST. WILL NOT DO AS ■ OFFICE TRAILER/GENER. 1 MANY LOADS AS THE OTHER TRUCKS ■ CARGO BOXES 4 ■ FLAT TRUCK [DELAYS: TRUCK 99 WAS DOWN FROM 10:00 AM TO 12:00 PM■ PUMP 2 [with AIR TANK PROBLEM, & TRUCK 67 WAS DOWN FROM 11:00 TO 12:30 PM WITH NO HEADLIGHTS & A FLAT TIRE
Description of Work:
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA__________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 77
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
02.217537 DAILY WORK FORCE REPORT0212D.xls
CITY_2IMCl00_001048128 NYC-WTC_000429469
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305135
Day shift daily workforce and equipment at World Trade site, Feb 13, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429470
Day shift workforce and equipment for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278693
Daily workforce roster and equipment listings for World Trade construction site, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291354
Night shift workforce and equipment for World Trade Center, Dec 13-15 2001.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278714
Daily labor roster for World Trade Center site showing personnel, roles, and equipment (Mar 1, 2002).
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419067
Day final daily workforce report with classifications and equipment details.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360511
Day final daily workforce sheet for World Trade Center site, Mar 1, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290058
Day shift workforce and equipment roster for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305171
Night final daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305135
Day shift daily workforce and equipment at World Trade site, Feb 13, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429470
Day shift workforce and equipment for World Trade Center construction.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278693
Daily workforce roster and equipment listings for World Trade construction site, Feb 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000268616
Daily workforce and equipment roster with labor and equipment details for World Trade Center site.
Similar indexed content
NYC-WTC_000237703
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similar indexed content
NYC-WTC_000305135
Day shift daily workforce and equipment at World Trade site, Feb 13, 2002.
Similar indexed content
NYC-WTC_000305134
Day shift daily workforce and equipment at World Trade site, Feb 12, 2002.
Similar indexed content
NYC-WTC_000429470
Day shift workforce and equipment for World Trade Center construction.
Similar indexed content