Air monitoring agreement, 114 Liberty Street, 2004

Machine-extracted title · confidence 36%

Proposal for independent air monitoring during asbestos cleanup at 114 Liberty Street; on-site TEM analysis plan.

NYC-WTC_000428730–000428732
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Air Monitoring Requirements For 114 Liberty Street

1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.

2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.

3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.

4. A final report shall be submitted to the DEP within days of project completion. The report shall clearly identify the work perforaied in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.

3 of 1

CITY_DEP_WORBY_CANNATA_SUBP_000117454

NYC-WTC_000428732

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000428732Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000429160

Independent air monitoring and construction inspection for asbestos cleanup at 114 Liberty Street interior.

Similar indexed content

NYC-WTC_000425472

Proposal/overview of air monitoring and construction inspection by a contractor for interior cleaning.

Similar indexed content

NYC-WTC_000428060

Independent air monitoring and construction inspection for asbestos cleanup at 114 Liberty Street interior.

Similar indexed content

Compare copies and versions →