NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Ambient Air QA Plan, LMDC Deconstruction, Aug 2005

Machine-extracted title · confidence 43%

Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).

NYC-WTC_000428324–000428440
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

z z -< ■<

o o io Ambient Air Monitoring Program Quality Assurance Project Plan 130 Liberty Street - NY, NY Section No. 8 Revision No.: 0 Date: August 2005 co

I Lower Manhattan Development Corporation Page 47 of 116 ■D c o o CT o o' to ■D 00 o o 3. 03 Tab e 8-9. Measurement Performance Criteria Table - PM|» and PM2.5 by Gravimetry o QC Sample or Activity DQI o Frequency Measurement Performance Criteria Corrective Action o c Field Duplicates 1/week *RPD < 40 when positive results for both Assess laboratory precision, qualify Precision-Overall 3 samples are > 5x QL data, and/or resample data. CD *No sihiation where one result is detected at > 5x QL and other result is not detected Field/Trip Blanks l/da/« 0±3pg Qualify data. Accuracy/Bias - Contamination Data Completeness Check NA Field 90%, Laboratory 95% NA Data Completeness Sample Reweigh 1/10 samples ± 10 pg Qualify data. Precision gross weighing 1/10 samples tare ± 10 pg Qualify data. Precision weighing be collected at a frequency of 1/day; during Phase 1 and 11 only 1 field/trip blank per week will be analyzed.

O

O m

o J] □0

s >

c □0 o o o L2005-346 Rev. 1

CJ) 00 00

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000428371Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000427221

Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.

Similar indexed content

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

NYC-WTC_000441561

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

Similar indexed content

NYC-WTC_000421577

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →