NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 6
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 21 of 116
- New York City Department of Health and Mental Hygiene
The LMDC received comments from regulatory agencies in January, 2005 and amended the draft
deconstruction plan. The LMDC resubmitted a revised plan to the regulatory agencies for final
approval in June, 2005. Regulator comments were again received on July 26, 2004. This QAPP
and companion Ambient Air Monitoring Plan were prepared in response to the July 26, 2005
regulator comments.
Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project
The document entitled Ambient Air Monitoring Program for the 130 Liberty Street
Deconstruction Project, August 2005 represents a revised and combined air monitoring plan
incorporating the following two prior plans: (i) the Draft Plan provided as Section 2 of the Draft
Deconstruction Plan issued on December 10, 2004 and (ii) the companion plan prepared by TRC
Environmental Corporation (TRC) entitled Proposed Enhanced Exterior Air Monitoring
Approach and Conceptual Design 130 Liberty Street (October 8, 2004). Both of these
documents were issued by the LMDC in December, 2004 for review and comment by federal,
state, and local regulators and the general public. At the time of release, readers of the two
companion plans were advised by LMDC that, due to their independent development, there were
redundancies and a good deal of overlap in the two plans. For this reason, LMDC intended to
revise the two programs to ensure that the monitoring programs were complementary and
contained the necessary overlap.
6.2 Project Purpose and Objectives
The principal purpose of the air monitoring program is to monitor air quality in the vicinity of
130 Liberty Street during the deconstruction of the building on that property. The plan consists
of monitoring of fugitive dusts in the vicinity of the deconstruction site on both a real-time or
continuous basis as well as a time-weighted or integrated basis.
Principal objectives of the program are as follows:
Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that fugitive dusts
associated with the building deconstruction are maintained below predetermined action
levels.
• In the event that fugitive dusts levels exceed predetermined action levels, building
deconstruction management personnel will be immediately notified so that all necessary
corrective actions can be taken.
• Monitor PMw and PM2.5 on a time-weighted or 24-hour average basis to provide assurances
that levels of respirable particulate matter associated with the deconstruction are below the
Target Air Quality Levels of 150 ug/m ' and 40 ug/m ; respectively.