Ambient Air Monitoring Program Section No. 16
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 110 of 116
Field analysis information will be transcribed directly into the field logbook or onto standardized
forms. If errors are made, results will be legibly crossed out, initialed and dated by the person
recording the data, and corrected in a space adjacent to the original (erroneous) entry. Each
member of the field sampling team will be responsible for an internal verification of the
transcribed information. Daily external verification of the field analysis records by the TRC
Field Sampling Coordinator will ensure that:
• Logbooks and standardized forms have been filled out completely and that the information
recorded accurately reflects the activities that were performed.
• Records are legible and in accordance with good record keeping procedures, i.e., entries are
signed and dated, data are not obliterated, changes are initialed, dated, and explained.
• Calibration procedures were conducted in accordance with the protocols described in the
QAPP, and that any deviations were documented and approved by the appropriate personnel.
16.1.3 Fixed Ixihoratory Data
16.1.3.1 Internal Reviews
Prior to the release of any data from the laboratory, the data will be verified and approved by
laboratory personnel. This review will consist of a tiered review by the person performing the
work, a qualified peer, and by supervisory personnel.
Prior to being released as final, laboratory data will proceed through a tiered review process.
Data verification starts with the analyst or technician who performs a 100 percent review of the
data to ensure the work was done correctly the first time. It is the responsibility of the analyst or
technician to ensure that the verification of data in his or her area is complete. The data
reduction and initial verification process must ensure that:
• Sample preparation and analysis information is correct and complete,
• Results are correct and complete,
• The appropriate methods have been followed and are identified in the project records,
• Proper documentation procedures have been followed,
• All nonconformances have been documented,
• Project-specific requirements have been met.
Following the completion of the initial verification by the analyst or technician, a systematic
check of the data will be performed by an experienced peer. Laboratory Section Leader, or
designee. This check will be performed to ensure that initial review has been completed
correctly and thoroughly. Included in this review will be an assessment of the acceptability of
the data with respect to: