NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 14
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 104 of 116
project files. Each hard-copy report and EDD will be logged in to TRC’s validation tracking log.
As the package proceeds through data validation, review, and data management, the status of the
package will be recorded in the log. Completion of validation and final disposition of the
package will also be documented.
All laboratory data will be maintained in a central file to allow easy retrieval of information and
electronic transfer of the data to other parlies. As laboratoiy analytical results are received, and
validated, the results will be saved to the central file.
All laboratory data will be provided by the laboratory in both electronic and hard copy format.
After the data are validated, appropriate modifications to the data will be made to reflect the
changes resulting from data validation (if any). A second quality assurance review will be
performed after the validated data are entered.
14.5.4 Data Analysis and Reporting
All data reports will present summaries of all validated data collected during the field
investigation.
14.6 Data Tracking and Control
Management of field data is described in Section 14.4.1. Laboratory data will be maintained as
described in the laboratory’s QA Manuals. TRC is the custodian of the project files and will
maintain the contents of the files, including all relevant records, reports, logs, field notebooks,
pictures, subcontractor reports, and data reviews in a secured, limited access area.
L2005-346 Rev. 1
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114745
NYC-WTC_000428428
OCR can misread numbers and units. Confirm readings against the page image before using them.