NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

QA/QC Plan, Environmental Monitoring Program

Machine-extracted title · confidence 54%

Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.

NYC-WTC_000427900–000428009
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

7.1.1 Sampling Tasks Sampling phases will consist of the following segments: Background, Phase I - Preparation Phase and Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work included in each phase are presented in the EnvironmenalCommunity Air Monitoring Program for the 133-135 Greenwich Street and 21-23 Thames Street Deconstruction Project, September 2005. Sampling methods, sampling QC, sample handling and custody are discussed in other sections of this QAPP. Tables 7-la, 7-lb, and 7-lc provide a general summary of target parameters, and numbers of field samples and QC samples expected to be collected on a weekly basis for each phase of the program. Tables 7-2 and 7-3 provide a summary of sampling frequencies after the background phase has been completed. Sampling locations are noted on Figures 7-1 and 7-2. Photographs of each site are included in Attachment A.

Background The background ambient air sampling period will consist of one week (7 consecutive calendar days) of monitoring performed immediately prior to the start of Phase I - Preparation Phase activities. Samples will be collected at three (3) stations. The locations include the roof of the school auditorium on Cedar Street, the top of the sidewalk bridge on Thames Street east of the site, and across Thames Street in front of 21 -23 Thames Street. This third monitoring location will be located on the sidewalk bridge through the Abatement Phase and for only a portion of the Demolition Phase. Once the demolition of the 21-23 Thames Street reaches the third level (i.e., parallel to the street bridge), the monitoring station located on top of the sidewalk bridge will need to be brought down to street level in front of 21-23 Thames Street. All target parameters will be collected over a 24-hour integrated period with the exception of asbestos, silica, PMio, PM2.5, and mercury. Mercury will be monitored utilizing a direct read mercury analyzer. PM10 and PM2.5 will be monitored continuously at each of the three (3) sites while asbestos and silica measurements will be taken at a frequency of once per work shift at each of the sites.

Phase I: Preparation and Asbestos and COPC Abatement and Removal During the Phase I (abatement phase) air monitoring will take place at three (3) stations each day. Baclkground organics data fnnl30 Liberty Street will be sued ofr this project. Sampling for semivolatile organics will be conducted at a once per week frequency employing the entire station network. One day per week on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at every station in the network. The schedule will be repeated until project completion. The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each weekly sampling event to undergo analyses for PCDDs/PCDs, PAHs and PCBs. The station with the highest 24-hour average PMio concentration (pg/ms) recorded with a collocated organic sample each week will be selected for semivolatile organic analyses.

27

CITY_DEP_WORBY_CANNATA_SUBP_0001 01678

NYC-WTC_000427926

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427926Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →