NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
7.0 PROJECT/TASK DESCRIPTION
This section provides a general overview of the activities that will be performed and how
and when they will be performed. Specific details for individual project activities will be
discussed in later sections of the QAPP.
7.1 Project Overview
Based upon the companion document Environmental Community Air Monitoring
Program for the 133-135 Greenwich Street and 21-23 names Street Deconstruction
Project, September 2005, the primary objective of this investigation is to monitor air
quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the
deconstruction of the building on that property. The plan consists of monitoring of dust in
the vicinity of the deconstruction site on both a real-time or continuous basis as well as a
time-weighted or integrated basis. These objectives will be satisfied by the sampling and
analysis program outlined in Sections 7.1.1 and 7.1.2. Laboratories performing these
analyses are summarized in Section 4.3.4 of the QAPP. There are multiple aspects and
levels to the overall air monitoring program proposed for the deconstruction of 133-135
Greenwich Street and 21-23 Thames Street. The following is a brief summary of the three
(3) components or levels of air monitoring proposed for the project:
• “Level 1”: The Contractors performing aspects of Phase I deconstruction work
(largely interior, non-structural efforts) will be responsible for collecting air
samples on their personnel directly performing various work activities to
determine airborne levels of contaminants potentially generated by the work at the
source as required by OSHA.
• “Level 2”: The next layer of sampling is for NYC Title 15, Chapter 1 compliance.
NYC Title 15, Chapter 1-required sampling will entail sampling the ambient air
inside the building during Phase I work outside of work areas, at the personnel
and waste load out decontamination stations and other locations. In addition,
samples will be collected, as required, outside the building within ten (10) feet
of the negative pressure ventilation exhaust. This sampling is further described in
the Asbestos and COPC Abatement and Removal Plan sections of the
Deconstruction Plan (August, 2005).
• “Level 3”: Beyond that, there will be continuous monitoring of the exterior
ambient air within the site boundaries and at specific elevated locations, as
described in the Community Air Monitoring Program (August 2005). This QAPP
further defines the technical approach and provides the anticipated schedule of
activities for the “Level 3” air monitoring. The other two “levels” of air
monitoring outlined above are documented in the Health and Safety Plan and The
Asbestos and COPC Abatement and Removal Plan sections of the
Deconstruction Plan (August, 2005).