NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

QA/QC Plan, Environmental Monitoring Program

Machine-extracted title · confidence 54%

Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.

NYC-WTC_000427900–000428009
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

7.0 PROJECT/TASK DESCRIPTION

This section provides a general overview of the activities that will be performed and how and when they will be performed. Specific details for individual project activities will be discussed in later sections of the QAPP.

7.1 Project Overview

Based upon the companion document Environmental Community Air Monitoring Program for the 133-135 Greenwich Street and 21-23 names Street Deconstruction Project, September 2005, the primary objective of this investigation is to monitor air quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the deconstruction of the building on that property. The plan consists of monitoring of dust in the vicinity of the deconstruction site on both a real-time or continuous basis as well as a time-weighted or integrated basis. These objectives will be satisfied by the sampling and analysis program outlined in Sections 7.1.1 and 7.1.2. Laboratories performing these analyses are summarized in Section 4.3.4 of the QAPP. There are multiple aspects and levels to the overall air monitoring program proposed for the deconstruction of 133-135 Greenwich Street and 21-23 Thames Street. The following is a brief summary of the three (3) components or levels of air monitoring proposed for the project:

• “Level 1”: The Contractors performing aspects of Phase I deconstruction work (largely interior, non-structural efforts) will be responsible for collecting air samples on their personnel directly performing various work activities to determine airborne levels of contaminants potentially generated by the work at the source as required by OSHA. • “Level 2”: The next layer of sampling is for NYC Title 15, Chapter 1 compliance. NYC Title 15, Chapter 1-required sampling will entail sampling the ambient air inside the building during Phase I work outside of work areas, at the personnel and waste load out decontamination stations and other locations. In addition, samples will be collected, as required, outside the building within ten (10) feet of the negative pressure ventilation exhaust. This sampling is further described in the Asbestos and COPC Abatement and Removal Plan sections of the Deconstruction Plan (August, 2005). • “Level 3”: Beyond that, there will be continuous monitoring of the exterior ambient air within the site boundaries and at specific elevated locations, as described in the Community Air Monitoring Program (August 2005). This QAPP further defines the technical approach and provides the anticipated schedule of activities for the “Level 3” air monitoring. The other two “levels” of air monitoring outlined above are documented in the Health and Safety Plan and The Asbestos and COPC Abatement and Removal Plan sections of the Deconstruction Plan (August, 2005).

26

CITY_DEP_WORBY_CANNATA_SUBP_0001 01677

NYC-WTC_000427925

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427925Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →