7.1.1 Sampling Tasks Sampling phases will consist of the following segments:
Background, Phase I - Preparation Phase and Phase I - Asbestos and COPC Abatement,
and Phase II - Structural Deconstruction. General descriptions of the work included in
each phase are presented in the EnvironmenalCommunity Air Monitoring Program for
the 133-135 Greenwich Street and 21-23 Thames Street Deconstruction Project,
September 2005. Sampling methods, sampling QC, sample handling and custody are
discussed in other sections of this QAPP. Tables 7-la, 7-lb, and 7-lc provide a general
summary of target parameters, and numbers of field samples and QC samples expected to
be collected on a weekly basis for each phase of the program. Tables 7-2 and 7-3 provide
a summary of sampling frequencies after the background phase has been completed.
Sampling locations are noted on Figures 7-1 and 7-2. Photographs of each site are
included in Attachment A.
Background The background ambient air sampling period will consist of one week (7
consecutive calendar days) of monitoring performed immediately prior to the start of
Phase I - Preparation Phase activities. Samples will be collected at three (3) stations. The
locations include the roof of the school auditorium on Cedar Street, the top of the
sidewalk bridge on Thames Street east of the site, and across Thames Street in front of
21 -23 Thames Street. This third monitoring location will be located on the sidewalk
bridge through the Abatement Phase and for only a portion of the Demolition Phase.
Once the demolition of the 21-23 Thames Street reaches the third level (i.e., parallel to
the street bridge), the monitoring station located on top of the sidewalk bridge will need
to be brought down to street level in front of 21-23 Thames Street. All target parameters
will be collected over a 24-hour integrated period with the exception of asbestos, silica,
PMio, PM2.5, and mercury. Mercury will be monitored utilizing a direct read
mercury analyzer. PM10 and PM2.5 will be monitored continuously at each of the three (3)
sites while asbestos and silica measurements will be taken at a frequency of once per
work shift at each of the sites.
Phase I: Preparation and Asbestos and COPC Abatement and Removal During the
Phase I (abatement phase) air monitoring will take place at three (3) stations each day.
Baclkground organics data fnnl30 Liberty Street will be sued ofr this project. Sampling
for semivolatile organics will be conducted at a once per week frequency employing the
entire station network. One day per week on a rotating basis (week #1 Monday, week #2
Tuesday, etc.) samples will be collected at every station in the network. The schedule will
be repeated until project completion. The semivolatile organic samples collected
employing this weekly sampling frequency will not be processed for analyses; rather they
will be placed in archival storage at the laboratory. A single set of samples will be
selected from each weekly sampling event to undergo analyses for PCDDs/PCDs, PAHs
and PCBs. The station with the highest 24-hour average PMio concentration (pg/ms)
recorded with a collocated organic sample each week will be selected for semivolatile
organic analyses.