NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
• Examination of site-specific and regional meteorological data to identify the
source(s) of the elevated ambient concentrations. Is the elevated concentration
likely attributable to activities at 133-135 Greenwich Street and 21-23 Thames
Street, regional background, sitc-spccific influences or none of the above, and
• Examine collateral data collected at the site (e.g., elevated metals
concentrations should coincide with elevated particulate concentrations at the
same site).
Every attempt will be made to eliminate any sources of sampling and analytical error
as early as possible in the program. An ongoing data assessment program throughout
the program will also assist in the early detection and correction of problems, thereby
ensuring that project objectives are met. Reconciliation with the project objectives
will have been considered to have been met if the measurement performance criteria
from Section 8.0 are met. If the data usability indicates that the project quality
objectives in Section 8.0 have not been met, then the project management team will
meet to determine any additional work to be performed.
17.0 REPORTING, DOCUMENTS, AND RECORDS
QA reports will be submitted to the AIRTEK Project Manager to ensure that any
problems identified during the sampling and analysis programs are investigated and
the proper corrective measures taken in response. The QA reports may include:
• All results of field and laboratory audits,
• Problems noted during data validation and assessment, and
• Significant QA/QC problems, recommended corrective actions, and the
outcome of corrective actions.
QA reports will be prepared and submitted on an as-needed basis.