NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
• Conformance to the field methodologies proposed in the QAPP,
• Conformance to the EPA and NIOSH methods provided in the QAPP,
• Adherence to proposed sampling strategy,
• Presence of elevated detection limits due to matrix interferences present in
background ambient air or contaminants present at high concentrations,
• Presence of analytes not expected to be present,
• Conformance to validation protocols included in the QAPP for both field and
laboratory data,
• Unusable data sets (qualified as “R”) based on the data validation results,
• Data sets identified as usable for limited purposes (qualified as “J”) based on
the data validation results,
• Effect of qualifiers applied as a result of data validation on the ability to
achieve the project objectives,
• Status of all issues requiring corrective action, as presented in the QA reports
to management,
• Effect of nonconformance (procedures or requirements) on project objectives,
• Adequacy of the data as a whole in meeting the project objectives,
• Identification of any remaining data gaps and need to reevaluate data needs,
• Examination of site-specific and regional meteorological data to identify the
source(s) of the elevated ambient concentrations. Is the elevated concentration
likely attributable to activities at 133-135 Greenwich Street and 21-23 Thames
Street, regional background, sitc-spccific influences or none of the above, and
• Examine collateral data collected at the site (e.g., elevated metals
concentrations should coincide with elevated particulate concentrations at the
same site).
Every attempt will be made to eliminate any sources of sampling and analytical error
as early as possible in the program. An ongoing data assessment program throughout
the program will also assist in the early detection and correction of problems, thereby
ensuring that project objectives are met. Reconciliation with the project objectives
will have been considered to have been met if the measurement performance criteria
from Section 8.0 are met. If the data usability indicates that the project quality
objectives in Section 8.0 have not been met, then the project management team will
meet to determine any additional work to be performed.
17.0 REPORTING, DOCUMENTS, AND RECORDS
QA reports will be submitted to the AIRTEK Project Manager to ensure that any
problems identified during the sampling and analysis programs are investigated and
the proper corrective measures taken in response. The QA reports may include:
• All results of field and laboratory audits,
• Problems noted during data validation and assessment, and
120
CITY_DEP_WORBY_CANNATA_SUBP_000072660
NYC-WTC_000424442
OCR can misread numbers and units. Confirm readings against the page image before using them.