Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
1.2 Project Purpose and Objectives
The principal purpose of the air monitoring program is to monitor air quality in the vicinity of
130 Liberty Street during the deconstruction of the building on that property. The Proposed Plan
consists of monitoring of dusts in the vicinity of the deconstruction site on both a real-time or
continuous basis as well as a time-weighted or integrated basis.
Principal objectives of the program are as follows:
• Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that dust
associated with the building deconstruction are maintained below target and trigger
action levels.
• In the event that dust levels exceed target and trigger action levels, building
deconstruction management personnel will be immediately notified so that all necessary
corrective actions can be taken.
• Monitor PMio and PM2.5 on a time weighted or 24-hour average basis to provide
assurances that levels of respirable particulate matter associated with the deconstruction
are below 24 hour National Ambient Air Quality Standards (NAAQS) of 150 ug/m ' and
65 ug/m^, respectively.
• Collect particulate matter on a time-weighted or integrated basis such that samples are
available for monitoring of target compounds potentially associated with World Trade
Center dust (e.g., asbestos, lead).
• Compare measured concentrations of project target parameters to action levels
established on a compound specific basis. In the event that measured concentrations
exceed any project specific action level for one or more of these target compounds,
appropriate corrective actions immediately will be taken.
1.3 Overview of Air Quality Monitoring Programs and Features
There are multiple aspects and levels to the overall air monitoring program proposed for the
deconstruction of 130 Liberty Street. The following is a brief summary of the three (3)
components or levels of air monitoring proposed for the project:
• “Level 1”: The subcontractors performing aspects of Phase I deconstruction work
(largely interior, non-structural efforts) will be responsible to collect air samples on their
personnel directly performing various work activities to determine airborne levels of
contaminants potentially generated by the work at the source as required by OSHA.