Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
8.1.1 Target Air Quality Levels................. 8-2
8.1.2 USEPA Site Specific Trigger Levels 8-2
9.0 EXCEEDANCE NOTIFICATION.............. 9-1
10.0 QUALITY ASSURANCE/QUALITY CONTROL.................. 10-1
10.1 Overview.................................................................................. 10-1
10.2 Quality Assurance/Quality Control......................................... 10-1
11.0 ELECTRONIC DATA MANAGEMENT AND REPORTING 11-1
11.1 Data Management 11-1
11.1.1 Real-Time Data........................................................... 11-1
11.1.2 Fixed Laboratory Data................................................ 11-1
11.1.3 Electronic Communication Equipment and Software 11-2
TABLES
Table 1. Locations of Monitoring Stations - 130 Liberty St. Deconstruction
Air Monitoring Network..................................................................................... 2-4
Table 2. Summary of Sampling and Analysis Methods................................................... 5-1
Table 3. Phase I - Minimum Air Sample Phase-In Schedule......................................... 6-3
Table 4. Phase I: Preparation Phase & Asbestos and COPC Abatement and Removal
Sampling and Analysis Summary....................................................................... 6-4
Table 4. Phase 1: Preparation Phase & Asbestos and COPC Abatement and Removal
Sampling and Analysis Summary....................................................................... ..6-5
Table 5. Phase II - Structural Deconstruction Phase Sampling and Analysis Summary ..6-6
Table 6. Target Air Quality Levels and USEPA Site Trigger Levels............................. ..8-1
Table 7. Elements Typically Contained in a Quality Assurance Project Plan (QAPP) .. 10-2
Table 8. Data Reporting Schedule and Frequency for Each Program Phase.................. 11-2
FIGURES
Figure 1. Network Schematic- Site Location Map and Locations of Proposed
Air Monitoring Locations..................................................................................
Figure 2. Network Schematic-Locations of Off-Site Elevated Roof -Top Stations and
“Floating” Stations on Scaffolding................................................................... 2-3
ii
CITY_DEP_WORBY_CANNATA_SUBP_000075873
NYC-WTC_000424706
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000424706Source: NYC Law Department, mirrored locally