Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
Table 4. Phase I: Preparation Phase & Asbestos and COPC Abatement and Removal
Sampling and Analysis Summary
Location Parameter(s) Sample Frequency Analysis Method
Off-Site Roof Top 1. Asbestos Each Day (asbestos and 1. TEM/SEM
and Scaffolding 2. Silica silica are sampled during 2. XRD
(4 locations on off work shift)
site roof tops and 4 3. Metals Each Day (24 hr. Basis) 3. ICP/MS
locations on 4. PCDDs/PCDFs 4. HRGC/HRMS
scaffolding)* 5. PAHs 5. GC/MS
6. PCBs 6. GC/ECD
7. Mercury (total) 7. lodated Caibon
Trap/CVAFS
8. PM,o Continuously “Real-Time” 8. EB AM/Gravimetric
9. PM2.5 Each Day (PMio and PM2 5 9. EB AM/Gravimetric
on 24 hour basis at each
location; PMio and PM2.5
reference sampler at 1
location per day on 24-
hour basis witli location
changed monthly)
* - If Phase I Asbestos and COPC Abatement proceeds below the scaffold monitors, then additional air monitoring for metals
utilizing NIOSH Methods will be conducted at the exhaust manifolds on the lowest elevation of the work area grouping.
6.4 Phase II - Structural Deconstruction
During Phase II of the deconstruction project, air monitoring will take place at twelve (12)
stations each day (Table 1 Locations 1-12). During the first three (3) days only of Phase 11,
samples will be collected and analyzed for semi-volatile organics to include PCDDs/PCDFs,
PAHs and PCBs. After this first three (3) day period, sampling for semivolatile organics will be
reduced to a once per week frequency employing the entire station network. One day per week
on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at eveiy
station in the network. The schedule will be repeated until project completion.
The semivolatile organic samples collected employing this weekly sampling frequency will not
be processed for analyses; rather they will be placed in archival storage at the laboratory. A
single set of samples will be selected from each weekly sampling event to undergo analyses for
PCDDs/PCDFs, PAHs and PCBs. This sample set will be selected after consideration of the
PMio data corresponding to the sites and days where organic samples were collected. The station
with the highest 24-hour average PMio concentration (ug/m3) recorded with a collocated organic
sample each week will be selected for analyses.
A summary of sampling frequencies on a target parameter specific basis applicable to Phase II
(deconstruction phase) of the deconstruction program is provided in Table 5.
6-5