NYC 9/11 Public Portal Document
Table 3
PHASE I - MINIMUM AIR SAMPLE PHASE-IN SCHEDULE
PHASE I - SOUTH PHASE I - COPC PHASE I - SOUTH PHASE I -
HOIST/VESTIBULE PHASE I - ABATEMENT HOISTATESTIBULE SCAFFOLD
CONSTRUCTION SCAFFOLD CELLAR & CONSTRUCTION - ERECTION PHASE I - COPC
BACKGROUND UP TO lOTH ROOFTOP ERECTION UP BOTTOM 8 lOTH Io 40TH ABOVE lOTH ABATEMENT
WORK PHASES AIR SAMPLING FLOOR CLEANING TO lOTII FLOOR FLOORS FLOOR FLOOR TOP DOWN PHASE II
* First Elevated Scaffold station to be installed at 10th floor when scaffold leading edge is at 12th floor. When leading edge is at 22nd floor, stations to he moved to 20th floor.
When leading edge is at 32nd floor, stations to be installed on 30th floor as feasible.
o
1^
** Downward moving of Elevated Scaffold stations will be based on highest reasonable floor in relationship to work as will be determined in consultation with RPA.
o
m
o
J]
□0
'o
>
z
z
>
s
c
□0
l"”
o
o 130 Liberty Street Rev. No.: 0
o
o Ambient Air Monitoring Program 6-3 September 7, 2005
tn
00
CD
NYC-WTC_000424724