Ambient air monitoring, 130 Liberty Street deconstruction

Machine-extracted title · confidence 54%

Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.

NYC-WTC_000442832–000442866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

z ■< z ■<

o o co g Table 3 o PHASE I - MINIMUM AIR SAMPLE PHASE-IN SCHEDULE I “0 o c o er o o ro u oo o tn 3. ro 03

0 O O c 3 Q 3 PHASE I - SOUTH PHASE I - COPC PHASE I - SOUTH PHASE I - HOISTA'ESTIBULE PHASE I - ABATEMENT HOIST/VESTIBULE SCAFFOLD CONSTRUCTION SCAFFOLD CELLAR & CONSTRUCTION - ERECTION PHASE I - COPC BACKGROUND UP TO lOTH ROOFTOP ERECTION UP BOTTOM 8 lOTH to 40TH ABOVE lOTH ABATEMENT WORK PHASES AIR SAMPLING FLOOR CLEANING TO lOTH FLOOR FLOORS FLOOR FLOOR TOP DOWN PHASE II

ON-SITE GROUND LEVEL STATIONS 4 4 4 4 4 4 4 4 4

ON-SITE ELEVATED STATIONS 4 (Roof) 4 (Scaffold*) 4 (Scaffold**) 4 (Scaffold**)

OFF-SITE ELEVATED STATIONS 1 1 1 1 1 4 4 4 4

* First Elevated Scaffold station to be installed at 10th floor when scaffold leading edge is at 12th floor. When leading edge is at 22nd floor, stations to be moved to 20th floor. When leading edge is at 32nd floor, stations to be installed on 30th floor as feasible.

** Downward moving of Elevated Scaffold stations will be based on highest reasonable floor in relationship to work as will be determined in consultation with EPA.

O

K I

s O o o I o o co 130 Liberty Street Rev. No.: 0 co Ambient Air Monitoring Program 6-3 September 7, 2005 co o co

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442852Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000441904

Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.