NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 129 pages

CoC: Environmental Community Air Monitoring Plan

Machine-extracted title · confidence 52%

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

NYC-WTC_000424323–000424451
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

hexa congeners and 40-120% for hepta and octa congeners Field Spikes Every sample, Percent Reanalyze Accuracy/Bias (pre-sampling) blank, QC recoveries 70- and/or qualify 130% for data. Laboratory 1/batch (10 Percent Determine Accuracy/Bias Control Sample samples) differences cause of precision (BCS3) between LCS problem RRF and ICAL reanalyze RRF< 20 and/or qualify 2/analytical RPD between 2 data. sequence LCS analyses < 20 Method Blanks 1/batch No target Reclean, Accuracy/Bias- compounds > reanalyze Contamination QL and/or qualify data Field/Trip 1/day No target Reclean, Accuracy/Bias- Blanks compounds > reanalyze, Contamination QL and/or qualify PUF Media 1/batch cleaned No target Reclean, Accuracy/Bias- Cleaning compounds > reanalyze, Contamination Verification QL and/or qualify Check Recovery Every sample, Signal: noise Reanalyze Accuracy/Bias Standards blank, QC ratio must be > and/or qualify 10:1 data. Data NA Field 80%; NA Data Completeness Laboratory Completeness Check 95% ' Includes the following compounds: ” 014-2,3,7,8-TCDD:1.6ng ”0,2-1,2,3,4,7-PeCDD:4ng ”Ci2-l,2,3,4,6-PeCDF:4ng ”C,2-l,2,3,4,6,9-HxCDFL4ng ”C,2-l,2,3,4,6,8,9-HpCDF:4ng Field duplicates may not be consistently collected at a frequency of 1/week during Abatement and Demolition Phases as the location selected for analysis will be dictated by PMio measurements. ’ Will be collected at a frequency of 1/day; during Abatement and Demolition Phases only 1 field/trip blank per week will be analyzed. Reanalyze: refers to reanalysis of the same extract.

Tab/e S-6. Measurement Performance Criteria rab/e-Mercu/vbirCVAFS QC Sample or Frequency Measurement Corrective DQI Activity Performance Action Criteria Field 1/every other week “^RPD < 40 Assess Precision-

44

CITY_DEP_WORBY_CANNATA_SUBP_000072584

NYC-WTC_000424366

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000424366Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

NYC-WTC_000427716

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

Compare copies and versions →