NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

QA Plan for Air Monitoring Program, Sept 2005

Machine-extracted title · confidence 55%

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

NYC-WTC_000423885–000423994
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

Asbestos sample collection will be performed in accordance with NIOSH Method 7402 - Asbestos by TEM following the recommendations for personal sampling. Samples will be collected at a rate of six liters per minute (6 1pm) for a minimum of eight (8) hours for a resulting total volume of approximately 2.88 rm. To ensure optimum accuracy, the sampling rate will be adjusted, as needed, to produce a fiber density of 100 to 1,300 fibers/mnu. Pump flow rates of each personal sampling pump, with a representative sampler in line, will be measured before and after sample collection. The pump will be run for 10 minutes prior to checking the flow rate. A suitable rotameter (or bubble meter) will be connected to the filter inlet, the flow screw adjusted to the desired sampling value, and the flow rate observed on the rotameter (or bubble meter) will be verified as constant for a minimum of 20 seconds. Flow rates will be recorded on Field Sampling Data Sheets or an equivalent field logbook. Immediately prior to collecting a sample, the sampler will be fastened to a location (i.c., on a tripod) near the individual’s breathing zone, the top cover of the filter cassette cowl extension (“open face”) will be removed and positioned “face down” in the sampler. The joint between the extender and monitor body will be wrapped with tape to hold the cassette securely in place and to provide a surface to identify the cassette. By inserting a pin through the hole near the display screen, the elapsed time indicator is reset prior to sampling. At the end of the sampling period, the top cover and small end caps are replaced. Samples are transported upright to the laboratory in a rigid container with packing material to prevent jostling or damage. To avoid electrostatic forces from causing fiber loss from the sampling filter, untreated polystyrene foam will not be used for any of the shipping container materials. Samples for asbestos will be collect using two different media to accommodate the SEM and TEM analyses. Equipment and supplies utilized with this sampling approach are as follows:

• Thompson Personal Sampling Pump (or equivalent) - 5 to 15 1pm • Battery Pack - Rechargeable lithium ion battery pack (or equivalent), fitted with a belt clip, compatible with the personal sampling pump. • Filters/TEM analysis - Mixed cellulose ester membrane filters, 0.45-|Jm pore size, with a non-conductive cowl, supported by a cassette filter holder, suitable for connection with the personal monitoring pump system. • Filters/SEM analysis -Polycarbonate filters, 01 .pm pore size with 25 mm diameter cassette. • High Flow Rotometer - 2.0 to 20.0 1pm

10.2.4 Respirable Crystalline Silica and Dust

Respirable dust and crystalline sampling will be performed according to NIOSH Method 0600 - Particulates Not Otherwise Regulated, Respirable following the recommendations for personal sampling. Samples will be collected at a rate of approximately two liters per minute (2 1pm) for a minimum of eight (8) hours for a resulting total air volume of approximately 1.0 m3. To ensure optimum accuracy, the sampling rate will be adjusted, as needed, not to exceed 2 mg dust loading on the filter. Filters are pre-weighed to a constant weight in the controlled weighing area. If

46

CITY_DEP_WORBY_CANNATA_SUBP_000070980

NYC-WTC_000423930

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000423930Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →