QA Plan for Air Monitoring Program, Sept 2005

Machine-extracted title · confidence 55%

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

NYC-WTC_000423885–000423994
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

Cleaning and Deconstruction Work

In September, 2005 the The Greenwich Street Project, LLC released documents for the Deconstruction of 133-135 Greenwich Street and 21-23 Thames Street buildings. Deconstruction will include Asbestos and COPC Abatement and Removal and Structural Deconstruction. The Asbestos and COPC abatement and removal phase includes the cleaning and removal of all interior surfaces and non-structural elements within the building under containment. The clean-up and abatement will be conducted so that the buildings can be safely deconstructed to allow for redevelopment of the Site. The Asbestos and COPC Abatement and Removal Phase deconstruction will occur while the work area is placed under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and certain non-porous building materials and components, (c) cleaning and salvage of certain installed non-porous building equipment and components, (d) removal of building materials containing asbestos which were present in the Building prior to September 11th, 2001 (referred to herein as “ACBM”), primarily within the Building interior, (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury- containing thermostats, etc. at generation points, movement of containers to the decontamination unit and movement of decontaminated containers to waste loading, and cleaning of exterior surfaces of the Building (i.e. building washdown). The proposed cleanup and abatement will be conducted so that the Building can be safely deconstructed in compliance with applicable law to allow for redevelopment of the Site. Following Asbestos and COPC Abatement and Removal Phase deconstruction and removal of the remaining “clean” building components including the clean exterior brick walls, roofs, and structural wood components will be carried out. The deconstruction of the building at 133-135 Greenwich Street and 21-23 Thames Street is expected to consist generally of: (a) cleaning and preparation of the building for deconstruction; (b) deconstructing the building; (c) undertaking environmental monitoring during the deconstruction; (d) transporting and disposing of all waste and debris from the building; and (e) backfilling, grading and paving the Site as appropriate following the cleaning and deconstruction.

Regulatory Oversight The The Greenwich Street Project, LLC is the owner of 133-135 Greenwich Street and 21-23 Thames Street and is fully responsible for the cleaning and deconstruction of the building and will comply with all Federal, State and City regulations pertaining to environmental protection, asbestos abatement, hazardous material disposal and construction. The The Greenwich Street Project, LLC released the draft deconstruction plan documents including Health and Safety Plan, Community Monitoring Plan, and Waste Characterization Planand Quality Assurance Project Plan in September, 2005 and formally submitted the plans for review to the following agencies: • United States Environmental Protection Agency • United States Occupational Safety and Health Administration (OSHA) • New York State Department of Labor (NYSDOL) • New York State Department of Environmental Conservation (NYSDEC) • New York City Department of Environmental Protection (NYCDEP)

19

CITY_DEP_WORBY_CANNATA_SUBP_000070953

NYC-WTC_000423903

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000423903Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →