NYC-WTC_000430731
Final report chain-of-custody for PS 234M project, October 2001.
7 shared non-person entities · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗Executive summary of monitoring and cleaning for PS 234M; Oct 2001.
NYC-WTC_000420386–000420388OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
PS 234M SCA Job #14443 Warren & Panzer Engineers, P.C. October, 2001
) 1.0 EXECUTIVE SUMMARY
Warren & Panzer Engineers, P.C. (W & P) was retained by New York City School Construction Authority, 30-30 Thomson Avenue, Long Island City, New York, to perform project monitoring at PS 234M, Manhattan, New York.
Wet wipe cleaning / HEPA vaccuming was performed by PAL, Kiss Construction, and Citywide Environnientat Services. The"work took place' from October 2 to OcfoSef 17,2001 and incfuded the wet wiping and HEPA vacuuming of all surfaces within the school and powerwashing of the exterior.
10/02/01 - Wet wiping / HEPA vacuuming of mechanical room, floor, and 2“*^ floor 10/03/01 - Wet wiping / HEPA vacuuming of mechanical room, 3rd floor, and 2nd floor 10/04/01 - Wet wiping / HEPA vacuuming of basement, 1st floor, 2nd floor, 3rd floor, and mechanical room. TEM air sampling of mechanical room. 10/05/01 - Wet wiping / HEPA vacuuming of 1st floor, 2nd floor, 3rd floor. Powerwashing of north bell
tower and exterior of school. 10/06/01 - Wet wiping/HEPA vacuuming of auditorium. Construction of tents for duct cleaning. 10/07/01 - Construction of tents for duct cleaning 10/08/01 - Smoke testing of tents on 3rd floor. Construction of tents of floors 1, 2, and 3. 10/09/01- Ductwork cleaning begins 10/10/01 - Roof and duct cleanmg, and powerwashing of roof 10/11/01 - Duct cleaning of 2r^d 3rd floors. ) 10/12/01 - Fine cleaning of basement, 1st floor, 2^d floor, 3rd floor, and basement. 10/13/01 - Duct cleaning complete, fine cleaning on all floors 10/15/01- Fine cleaning continues on all floors 10/16/01 - Final touch-up cleanings on roof, 1st floor, 2’rd floor, 3rd floor, and basement. Filters are placed over fresh air intakes and univents. Perform aggressive TEM air sampling with ventilation system in operation.
Project Monitoring and Air sampling were both performed by Warren & Panzer Engineers, Asbestos Handling License AC-97-0645. The results included in Appendix F indicate that the required re-occupancy criteria for these areas has been achieved in accordance with New York City Title 15 and ICR 56.
Air samples were analyzed by Transmission Electron Microscopy (TEM). Sample Analysis was performed by ATC Associates, Inc. (ELAP #10879).
Fal^o J iesh Ladhani Senior ^ject Manager isistant Project Manager
)
3 CITY_21MC100_0 10318632
NYC-WTC_000420386
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000430731
Final report chain-of-custody for PS 234M project, October 2001.
7 shared non-person entities · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430730
Consultant payment response for 234M, Nov 26, 2001; LLW 28680.
1 shared non-person entities · 1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232545
Report detailing aggressive transmission electron microscopy air sampling conducted at PS 234 on October 16, 2001.
3 shared non-person entities · similarity 0.891
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000420384
Final report by Warren & [name], PS 234M project, Oct 2001.
4 shared non-person entities · 1 shared topics · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000323762
Final report for a construction-related project by Warren & [name], SCA.
7 shared non-person entities · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284207
Invoice with timesheet totals and project monitoring labor costs.
Similar document embedding; no shared entity or topic indexed. · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000230447
Appendix containing laboratory certifications for a project involving the New York City Board of Education, dated March 2002.
2 shared non-person entities · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119663
Fax correspondence dated June 10, 2002, requesting urgent review of documents related to a site at 55 [name].
1 shared non-person entities · 1 shared topics · similarity 0.891
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122659
Invoice for roof asbestos abatement work completed at 176 Broadway covering over 77,000 square feet.
3 shared non-person entities · 1 shared topics · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112249
Invoice from Asbestos Removal Corp for asphalt roof cleanup services performed at 26 Wall Street in June 2002.
3 shared non-person entities · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119587
Invoice from Kurzban & Son Control Inc. for roof work completed at 119 Fulton Street.
2 shared non-person entities · similarity 0.888
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128966
Invoice for debris removal services at 122 Fulton Street issued by Kurzban & Son Control, Inc. to the DEP in 2002.
3 shared non-person entities · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000323762
Final report for a construction-related project by Warren & [name], SCA.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430731
Final report chain-of-custody for PS 234M project, October 2001.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283896
September 4, 2002 memo noting TEM air samples from roofing/facade cleaning at 181 Broadway; clearance achieved.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128966
Invoice for debris removal services at 122 Fulton Street issued by Kurzban & Son Control, Inc. to the DEP in 2002.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128839
Inspection report recording facade and roof cleanup operations with visual debris checks at 114-116 Fulton Street.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128927
Invoice for debris removal services at 120 Fulton Street issued by Kurzban & Son Control, Inc. to the DEP in 2002.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000323762
Final report for a construction-related project by Warren & [name], SCA.
Similar indexed content
NYC-WTC_000430731
Final report chain-of-custody for PS 234M project, October 2001.
Similar indexed content
NYC-WTC_000430730
Consultant payment response for 234M, Nov 26, 2001; LLW 28680.
Similar indexed content
NYC-WTC_000284207
Invoice with timesheet totals and project monitoring labor costs.
Similar indexed content
NYC-WTC_000230447
Appendix containing laboratory certifications for a project involving the New York City Board of Education, dated March 2002.
Similar indexed content