NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Final report, W&P project

Machine-extracted title · confidence 36%

Final report for a construction-related project by Warren & [name], SCA.

NYC-WTC_000323762–000323764
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PS 234M SCA Job # 14443 Warren & Panzer Engineers, P.C. October, 2001

1.0 EXECUTIVE SUMMARY

Warren & Panzer Engineers, P.C. (W & P) was retained by New York City School Construction Authority, 30-30 Thomson Avenue, Long Island City, New York, to perform project monitoring at PS 234M, Manhattan, New York.

Wet wipe cleaning / HEPA vaccuming was performed by PAL, Kiss Construction, and Citywide EnvircmineKtat Services. The work took place from Ocloberl to’Qcfoher 17’2001 and'included tLe wet wiping and HEPA vacuuming of all surfaces within the school and powerwashing of the exterior.

10/02/01 - Wet wiping / HEPA vacuuming of mechanical room, 3rd floor, and 2'rd floor 10/03/01 - Wet wiping / HEPA vacuuming of mechanical room, 3rd floor, and 2'^d floor 10/04/01 - Wet wiping / HEPA vacuuming of basement, Ut floor, 2’rd floor, 3rd floor, and mechanical room. TEM air sampling of mechanical room. 10/05/01 - Wet wiping / HEPA vacuuming of Ut floor, 2nd floor, S' d floor. Powerwashing of north bell

tower and exterior of school. 10/06/01 - Wet wiping/HEPA vacuuming of auditorium. Construction of tents for duct cleaning. 10/07/01 - Construction of tents for duct cleaning 10/08/01 - Smoke testing of tents on 3rd floor. Construction of tents of floors 1, 2, and 3. 10/09/01- Ductwork cleaning begins 10/10/01 - Roof and duct cleaning, and powerwashing of roof 10/11/01 - Duct cleaning of 2'rd and 3rd floors. 10/12/01 - Fine cleaning of basement, 1st floor, 2rid floor, 3rd floor, and basement. 10/13/01 - Duct cleaning complete, fine cleaning on all floors 10/15/01- Fine cleaning continues on all floors 10/16/01 - Final touch-up cleanings on roof, Ut floor, 2nd floor, 3rd floor, and basement. Filters are placed over fresh air intakes and univents. Perform aggressive TEM air sampling with ventilation system in operation.

Project Monitoring and Air sampling were both performed by Warren & Panzer Engineers, Asbestos Handling License AC-97-0645. The results included in Appendix F indicate that the required re-occupancy criteria for these areas has been achieved in accordance with New York City Title 15 and ICR 56.

Air samples were analyzed by Transmission Electron Microscopy (TEM). Sample Analysis was performed by ATC Associates, Inc. (ELAP #10879).

Falfio SesnTadhani Senior ^ject Manager Assistant Project Manager

3 CITY_21MC100_011274159

NYC-WTC_000323764

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000323764Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →