Daily work force report, World Trade Center, Dec 20 2001

Machine-extracted title · confidence 28%

Night final report of workforce and equipment for World Trade Center, Dec 20, 2001.

NYC-WTC_000419115
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTR/CTING CORP. 1S1-4S^lh Road. WWleston« N.Y. 113 ST-(718)707.0000 DATE; DECEMBER 20, 2001 {NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & LocatloinK World Trade Center Contract No. Weather Conditions'WINDY & CHILLY ±s •b ii... . ..... til Labbr F Equipment

E s2s25=aa5=sss=2=a!s==saas^^ Hi CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT ~|i 2 :AT 966 LOADER 1 PROJECT ENGINEERS 1 CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 2 ■ CAT365GRAPPLER 1 SAFETY OFFICER ■ CAT375GRAPPLER 1 LABORERS IRON WORKERS f Ji I 19 ■ HITACHI 750 GRAPPLER ■ HITACHI 550 BACKHOE 7 1 LOCAL 14 i- 5 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 t 3 ■ HITACH11200 GRAPPLER 1 CARPENTER CARPENTER FOREI .N TEAMSTERS 11 I 1 ■ 1B5CFM COMPRESSOR ■ 235 HAMMER HOE RAM ■ MECHANICS TRUCK 1

1 1 1 MECHANICS 1 ■ TOOL TRUCK HOUSE WRECKERS 8 ■ TOOL VAN ■ ROLL OFF ■ DUMP TRAILERS ■ LOW BED TRAILER DELIVERIES: NONE h H________________ _ ■ HIGH DECK TRAILERS ■200/750/365 STARTED NIGHT WORKING BOTTOM 1 WELDING TRUCK EAST & NORTH OF V|,STA 120p LATER WORKED FUEL TRUCK 1 CHILLER ROOM AREA & 375 RICKED STEEL FROM PICKUP TRUCKS 2 BACK OF VISTA & LOADED FUATS. 1200 & 973 LOADED LIGHT TOWERS 13 EUKES. It I SITE MULE 3 CONTINUED DUMPING EUKES TOP OF AMEC RAMP IpUMP TRUCKS ' — 10 WHEEL DUMP TRUCK TRUCKING ON SEPARATE SHEET______________ ~~ FLASHING ARROW BOARD 1 III i,.................. OFFICE TRAILER/GENER, T WE WERE DIRECTED [TO STOP MANIFESTING TRUCKS CARGO BOXES 4 AS OF MIDNIGHT I I; FLAT TRUCK 1 E PUMP ROLLER 2 1 I RAINMAKEfeGENIE LIFT 1 I; Description of Work: i_ MAN TARPING AND ijRIMMING STATIONS MAINTAIN TRAFFIC F,LOW INTO AND OUT OF AREA_____________________________________ |MAN WATERING STA/TiONS FOR DUST CONTROL______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT I

it GRACE CONTRACTING CORP Approved By: Title: SUPeRINTENDEOT /

DAILY WORK FORCE REPORT 1220N.xls 01.303979

CITY_21MC100_001070945 NYC-WTC_000419115

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419115Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000290105

Daily workforce details for World Trade site, Dec 20 2001.

Similar indexed content

Compare copies and versions →