Daily work force report, World Trade Center, Dec 11 2001

Machine-extracted title · confidence 28%

Night shift workforce and equipment listing for World Trade Center, Dec 11, 2001.

NYC-WTC_000419111
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 4 ■■■■•.■'

GRACE CONTRACTING CORP, j 151-45 6lh Road, Whitestone, N.Y. 11357-(718) 787-9000 DATE: DECEMBER 11,2001 (NIGHT FINAL) i 8PM- DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center I Contract No. Weather Conditions CLEAR & MILD i

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER • 1 FOREMEN 2 CAT365GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS . 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 12 TOOL VAN ROLL OFF DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES; HIGH DECK TRAILERS WELDING TRUCK 1200/750/375 DOWN BELOW LOADING OUT DEBRIS FUEL TRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS 3 TRAILERS AND EUKES LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS I DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS FLASHING ARROW BOARD 1 USED 446 i OFFICE TRAILER/GENER. 1 CARGO BOXES 3 DELAYS:__________________________ i______ 1200 DOWN FROM 11:45 TO 1:15 - RECOVERY 375 DOWN FROM 10:00 TO 10:30 - RECOVERY FLAT TRUCK PUMP ROLLER 2 1 £ RAINMAKER/GENIE LIFT 1 ■ ■

Description of Work: WORK COMPLETED LOAD OUT STEEL AND DEBRIS i [35 GRACE AREA MAN TARPING AND TRIMMING STATIONS 34 EUKES MAN WATER STATIONS FOR DUST CONTROL [31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title: “BY: For: SUPERINTENDENT QI.302542

DAILY WORK FORCE REPORT 1211N.xls

CITY_2IMCl0 0_0 010 7 0 4 7 7 NYC-WTC_000419111

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419111Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237597

A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.

Similar indexed content

Compare copies and versions →