NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Feb 2002

Machine-extracted title · confidence 42%

Day final daily workforce report detailing personnel and equipment assigned.

NYC-WTC_000419065
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 eth Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: 2/26/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor [ CLASSIFICATION QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER FOREMEN 1 CAT 365 GRAPPLER PROJECT ENGINEER 2 CAT 375 GRAPPLER 1 SAFETY ENGINEER 1 CAT 375 BUCKET 1 LABORERS 3 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 1200 GRAPPLER 1“ LOCAL 14 2 185 CFM COMPRESSOR RUNNING UNMANNED LOCAL 15 2 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 2 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK DELIVERIES: FUEL TRUCK 1 PICKUP TRUCKS 5 ‘NOTE: LIGHT TOWERS RAN 2 HOURS LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK DELAYS: TRUCK 63, 65, & 70 EACH HAD A DELAY OF ABOUT FLASHING ARROW BOARD 1 45 MINUTES DUE TO WORK ON GPS UNITS OFFICE TRAILER/GENER. 1 T99 DOWN 30 MIN. W/FLAT TIRE CARGO BOXES 4 “NOTE: HITACH11200 DOWN @2:00 PM, FLAT TRUCK 1 USED THE 375 GRAPPLE FROM 2:00 UNTIL 7:00 PM PUMP 2

Description of Work:____________________________________________________________________________________________ COMPLETED WORK:__________________________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE T67 DELAYED 1730-END OF SHIFT FOR HITACHI COMPUTER RECOVERY (ACCIDENTALLY LOADED INTO TRAILER) AND TIRE CHANGE

G^CE CONTRACTING CORP | Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0226D.xls ij 02,415864

CITY_21MC100_001056739 NYC-WTC_000419065

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419065Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →