NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 41 pages

Chain-of-custody, J&R HILMAN Resources, 125 Barclay Street, Nov 2001

Machine-extracted title · confidence 29%

Letter enclosing emergency cleanup reports for Barclay Street site; NOV 2001 reference.

NYC-WTC_000417347–000417387
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ..................................i.... Il-, -t. .-(A.-..-...-------- --'i.............. . --------- .►';‘.;:rif3 V.' ii: -.Ti‘ ; .i.

Re: environrne^a* Toting Page 4 of 5

Five samples were, identified ds dsbesM^bohtaihiiig-ih^ ACM is defined ,hs a material with greater than one percent, asbestos. 14 samples were found tO have trace.(i.e., less than.i%). asbestos content. Levels less than one percent are nothegulafed. .Four,dainpies had-no.asbestos detected. The laboratoiyyesultddeniohfetratte that asbestos contamination is jireseiit at or near evexy dutdioor arr intake in the buiidihg. Reference the attached laboratory results from EMSL ArialytiGal for locations.

The air hailing tinitfAHU) air copied condenser coils and ducts are heavily contaminated with dust. This portidn of this system does not handle any ventilation air that is distributed to occupied areas within the building.

With the AflUs not in operation,'..the outdoor air dampers were clo.sed:at the time of inspection. The damper seal appears normal, however some opportunity for leakage .wms: observed. The mixed air plenums ^d. unit interiors have minimal vihitfie^dust. The distiibUtiOh ductwork was not ihspCctedon Septembep;^' 2001. ...

Based on the asbestos levels detected and visual inspectipn, ail air handling units in the-building require a thorough cleaning. As a precaution, all air distribution ducts and the mechanical equipment rooms should also be cleaned. The firm and personnel performing the cleaning should be certified as an HVAC Duct Cleaning Specialists (e.g,, National Air Duct Cleaners Association). The firm must also have experience and certifications for asbestos abatement. Independent asbestos and dust testing should be performed by an Environmental Consultant after project completion and prior to occupancy.

Asbestos Surface Sampling

Asbestos settled dust sampling was performed in at least two locations (north. and south) on each floor of the building (except the Penthouse (no access) and Basement). A total of 21 samples were analyzed by the accredited asbestos laboratory using polarized light microscopy (PLM).

20 samples had no asbestos detected. One sample had trace (i.e., less than 1%) asbestos content. The trace sample was taken from the carpet in Room 527. The room window was left open during the disaster and the floor and room contents are covered with dust.

05728 CITY_21MC100_008877325

NYC-WTC_000417379

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000417379Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →