Contractor shall supply protective clothing and respiratory protection for the
duration of this operation (PAPR respirators are mandatory).
CC. If containers are broken or damaged, the Contractor or Waste Hauler shall, using
personnel who are properly trained and wearing proper protective equipment,
shall repackage the waste in properly labeled containers. Contractor shall then
clean the entire truck and its contents using HEPA-vacuums and wet cleaning
techniques until no visible residue is observed.
DD. Following the removal of all containerized waste, the Contractor shall
decontaminate the truck cargo area using HEPA-vacuums and/or wet cleaning
techniques until no residue is observed. All 6-mil polyethylene sheeting shall be
removed and discarded as asbestos-containing waste material along with
contaminated cleaning material and protective clothing, in containers at the
disposal site.
EE. The transporter(s) of all asbestos waste shall not back-haul any items on his return
from landfill/disposal site.
EE. All asbestos waste shall be disposed of in an approved Asbestos Eandfill site
only.
1. NO PERSON UNDER ANY CIRCUMSTANCES SHALL ABANDON
A.C.W. The same shall be disposed of only by certified persons in
approved landfills.
2. A manifest form will be signed by the Eandfill City documenting receipt
and acceptance of the asbestos-containing waste. This manifest will be
furnished to the City of New York.
3. It is the responsibility of the Asbestos Contractor to determine current
waste handling, transportation and disposal regulations for the work site
and for each waste disposal landfill. The Asbestos Contractor must
comply fully with these regulations and all appropriate U.S. Deaprtment
of Transportation, EPA and other Eederal, State and Eocal entities'
regulations and all other current legal requirements.
4. The Asbestos Contractor shall obtain an agreement from the transporter
(s) that the practice of "Back-Hauling" will not be engaged in, with respect
to any and all waste loads taken from this site during the work.
5. The Asbestos Contractor will document actual disposal of the waste at the
designated landfill by having completed a Disposal Certificate and will
provide a copy of the same to the Department of Design and Construction.
CAPITAL PROJECT NUMBER PO79201K 02081-90
100: CONTRACT DOCUMENTS REV. May 3,2000
- 90 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_0 06631339
NYC-WTC_000416851