CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-126
(3) Elevators that remain in service shall conform to the following
additional procedures to minimize the piston effect that results;
(i) Elevator control shall be modified to bypass the work area.
(ii) A final larger layer of 6-mil plastic sheeting is to be taped airtight
but with slack forming a larger perimeter diaphragm. Air leakage across
the barrier shall be corrected upon discovery, and the elevator shaft shall
be checked for airborne asbestos contamination.
(iii) This system shall be smoke tested daily.
(4) Elevator shafts shall not be used as waste chutes for asbestos-con
taining waste material.
(p) Adequate toilet facilities shall be provided in the vicinity of the clean
room external to the work place. Where such facilities do not exist, portable
service shall be provided.
§1 -126 ACM Procedures: Order of Work. If ACM throughout the struc
ture is not removed prior to the start of the demolition work approved by the
New York City Buildings Department Demolition Permit, the following Order
of Work (schedule) shall be followed for abatement activities conducted in
connection with a demolition.
Only after the ACM has been completely removed from the top three floors
of the structure to be demolished may the topmost floor be demolished subject
to the following limitations;
(a) None of the demolition activities shall compromise in any way ACM
abatement being done on lower floors.
(b) None of the chutes or other procedures used to remove the demolition
debris shall be routed through areas which are in the process of having ACM
removed, or hav„ prepared for abatement of ACM.
(c) Demolition workers shall proceed through uncontaminated areas
when approaching and leaving the areas where demolition is being per
formed. If the demolition workers must pass through the work area, passage
ways with appropriate air locks, through the area where ACM is being abated
shall be provided to allow the demolition workers to approach and leave the
area where demolition is being conducted.
(d) As ACM is removed from succeeding floors, additional floors may be
demolished as long as ACM abatement is always maintained at least two
floors below the level at which demolition is being conducted, until all the
ACM has been removed.
(e) Removal of ACM from levels below street level may be done simulta
neously with ACM removal from upper floors. However, when below street
level abatement is conducted, ACM shall always be removed from the lowest
, floor first before ACM is removed from higher elevation floors.
5903 RCNY 5-31-98
CITY_21MC1OO_OO6243OO6
NYC-WTC_000411875