NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-129

(f) Spillage of asbestos-containing waste material in an operating elevator shaft shall require: (1) immediate evacuation, shut down and isolation of all elevators in the affected elevator bank, and (2) containerization of all spilled visible accumulation of asbestos-con­ taining waste material from within the elevator car and shaft, and (3) HEPA vacuuming/wet cleaning of the contaminated surfaces in the elevator car and shaft in repetitive cycles until clearance air levels are achieved, and (4) one air sample to be taken at each terminus of the shaft to be analyzed by. PCM on a continuing basis until clearance air levels are achieved.

§1-129 Clean-Up Procedures: Preparation for Clearance Air Monitoring. The following final clean-up procedures for pre-demolition abatement shall be performed prior to commencement of clearance air monitoring: (a) All visible accumulations of asbestos-containing waste material shall be removed and containerized. Metal shovels may be used to pick up or move accumulated waste EXCEPT in the vicinity of plastic sheet isolation and surface barriers which could be perforated by these tools. The areas around the plastic sheet isolation barriers shall be cleaned of visible accumulations utilizing rubber dust pans and rubber squeegees. To pick up excess water and gross wet debris, a wet-dry shop HEPA vacuum dedicated to asbestos abate­ ment may be used. (b) All containerized waste shall be removed from the work area through the decontamination enclosures and the holding area. (c) All surfaces in the work area shall be wet cleaned using rags or mops. After allowing sufficient time for drying of the work area, HEPA vacuums shall be used to thoroughly clean all surfaces after gross clean-up. (d) Where porous construction materials or cinderblock-like materials have been plasticized for surface barrier containment, the plastic sheeting shall be cleaned as in subdivision (c) above, then sprayed with an encapsulant and removed when dry. (e) All surfaces in the work area shall be sprayed with an encapsu­ lant,which upon drying will not dissolve upon rewetting. Sufficient time for drying shall be allowed. (f) All tools and equipment shall be removed from the work area and decontaminated in the equipment decontamination enclosure system. (g) After successful clearance air monitoring (see §1-71 et seq.) the isola­ tion barriers shall be removed in conjunction with the use of a HEPA vacuum.

5905 RONY 5-31-98

CITY_21MC100_006243007

NYC-WTC_000411876

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411876Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →