Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
CHAPTER i—ASBESTOS CONTROL PROGRAM §1-112
(f) As a prerequisite to commencement of clearance air monitoring, a
thorough visual inspection shall verify the absence of asbestos-containing
waste material (e.g. dust).
(g) All containerized waste shall be removed from the work area through
the decontamination enclosures and the holding area.
(h) All tools and equipment shall be removed from the work area and
decontaminated in the waste decontamination enclosure system. Cloths,
mops, and other cleaning aids shall be disposed of as asbestos-containing
waste material.
(i) After successful clearance air monitoring (see §1-31 et seq.), the isola
tion barriers shall be removed in conjunction with the use of a HEPA vacuum.
5883 RCNY 5-31-98
CITY_21MC100_006243001
NYC-WTC_000411870
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000411870Source: NYC Law Department, mirrored locally