Air quality testing, PS 833, Trinity Place, 2002

Machine-extracted title · confidence 42%

Project worksheet for indoor/outdoor air testing at PS 833, monitoring costs Mar–Jun 2002.

NYC-WTC_000411654–000411655
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DATr: 06/27/2003 FEl?'‘'’AL EMERGENCY MANAGEMENT AGEM' , tOJECT APPLICATION SUMMARY (P.2/ DISASTER#. 1391

PACKAGE NO: 94

P.A. ID: 061-51000-22 APPLICANT: NEW YORK / EDUCATION, BOARD OF. EDUCATION, BOARD OF PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT

80B 2 B N N 03/11/2002 ($1,134.50) Site Number: 1 DAMAGED AIR ' DUST I WATER QUALITY TESTING FACILITY: PS 833 - 100 TRINITY PLACE, NEW YORK, NY 10006 FACILITY LOCATION: THIS PROJECT WORK SHEET REIMBURSES THE BOE $325,071.78 FOR THE ESTIMATED COSTS TO MONITOR THE INTERIOR AND EXTERIOR AIR QUALITY OF PS 833 FROM MARCH 1, 2002 TO JUNE 30, 2002. DUE TO THE SCHOOL'S PROXIMITY TO GROUND ZERO, AND THE POTENTIAL FOR CONTAMINANTS IN THE DUST SCOPE OF WORK: GENERATED BY THE DEBRIS REMOVAL EFFORT, THE AIR MONITORING AND ITS ASSOCIATED COSTS ARE CONSIDERED REASONABLE AND ELIGIBLE UNDER SECTION 403 OF THE STAFFORD ACT.

THE BOE CONTRACTED ATC ASSOCIATES TO PERFORM THE WORK, SPECIFICALLY CONDUCTING INDOOR AND OUTDOOR AIR QUALITY TESTING AS WELL AS WATER AND SURFACE CONTAMINATION TESTING. A TOTAL OF 10 AIR MONITORING STATIONS THAT CONDUCTED 11 AMBIENT AIR TESTS PER DAY WERE ESTABLISHED INSIDE THE SCHOOL BUILDING. AN ADDITIONAL 3 AIR MONITORING STATIONS THAT CONDUCTED 6 AMBIENT AIR TEST PER DAY WERE ESTABLISHED ON THE EXTERIOR OF THE SCHOOL. ADDITIONAL TESTING WAS DONE TO ADDRESS DUST AND WATER CONTAMINATION AS NEEDED. PLEASE SEE THE NARRATIVE FOR THE DETAILS OF WHERE THE AIR TESTING STATIONS WERE LOCATED, HOW MANY TESTS WERE COMPLETED PER DAY AT EACH MONITORING STATION, AND THE PARAMETERS OF THE TESTING. THE BOE HAS NOT BEEN INVOICED FOR ACTUAL COSTS. AND THEREFORE THE DOLLAR AMOUNT IN THIS PW IS BASED ON AN ESTIMATE PROVIDED BY THE APPLICANT’S VENDOR, ATC ASSOCIATES (ATTACHED TO THIS PW).

WORK COMPLETE CONSISTS OF EXPENSES FROM MARCH 1, 2002 TO APRIL 22, 2002 BY ATC ASSOCIATES AT PS 833 FOR A COST OF $139,780.87.

WORK TO BE COMPLETED CONSISTS OF EXPENSES FROM APRIL 23, 2002 TO JUNE 30, 2002 (THE END OF THE SCHOOL YEAR) BY ATC ASSOCIATES AT PS 833 FOR A COST OF $185,290.91, ATC WILL CONDUCT THE SAME INTERIOR AND EXTERIOR AIR QUALITY TESTING, AS WELL AS DUST AND WATER TESTING AS DESCRIBED ABOVE DURING THIS TIME PERIOD.

'•VERSION 1 - -"VERSION 1"”

WORK COMPLETE CONSISTED OF THE ACTUAL EXPENSES INCURRED BY THE NEW YORK CITY BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY ATC ASSOCIATES, A CONTRACTOR TO BOE AT PUBLIC SCHOOL 833 (PS 833, ALSO REFERRED TO AS PS 48S) COMMONLY CALLED THE HIGH SCHOOL OF ECONOMICS AND FINANCE. THE TOTAL ELIGIBLE WORK FROM JANUARY TO SEPTEMBER 2002 IS A COMPILATION OF FOUR PAYMENTS (THAT ARE ATTACHED TO THIS PROJECT WORKSHEET) AND TOTAL TO $634,472.45. PW 807 AND 808 WERE BASED ON ESTIMATES AND PROVIDED THE APPLICANT WITH FUNDS TO PERFORM THE WORK AT PS 833 TOTALING $415,000.40, LEAVING A DIFFERENCE OF $219,472.05, WHICH IS THE TOTAL ELIGIBLE ADDITIONAL CONTRACT COST FUNDED UNDER THIS PW. THESE ACTUAL INVOICES INCLUDE THE FOLLOWING:

PAYMENT #2 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM JANUARY TO FEBRUARY 2002. AS A RESULT OF A BOE DESK AUDIT, THE PAYMENT OF THIS VOUCHER WAS REDUCED FROM $87,215,20 TO $84,085.20, THE TOTAL ELIGIBLE CONTRACT COST FRO PAYMENT #2 WAS $84,085.20.

PAYMENT #7 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM MARCH TO APRIL 2002 THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #7 WAS $279,817.25.

PAYMENT #13 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY “ESTING FROM MAY TO JUNE 2002. THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #13 WAS $259,440.00.

PAYMENT #22 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM JULY TO SEPTEMBER 10, 2002 THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #22 WAS $11,130,00.

TOTAL ELIGIBLE ADDITIONAL CONTRACT COSTS INCURRED BY THE APPLICANT TOTAL S219.472.05."VERSION 2 -

0000 VERSION 1

THIS =INAL PW IS BEING WRITTEN TO DEOBLIGATE AN AMOUNT OF FUNDING THAT WAS INCLUDED IN THE ESTIMATES FOR THE PROJECT, BUT W'AS NOT EXPENDED BY THE APPLICANT Page 28 of 40

CONFIDENTIAL INSURANCE INFORMATION, CITY_2IMC100_007969895

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411654

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411654Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411653

Project application summary for PS 833 air quality monitoring costs reimbursement.