NYC 9/11 Public Portal Document
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151
PROJECT WORKSHEET Expires April 30, 2001
PAPERWORK BURDEN DISCLOSURE NOTICE
Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing
instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms.
You are not required to respond to this collection of information unless a valid 0MB control number is displayed in the upper right
corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to:
Information Collection Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472,
Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address.
DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY
FEMA- 1391 -DR- NY 061-51000-22 03/17/03 B
DAMAGE FACILITY WORK COMPLETE AS OF;
Air Quality Testing_____________ 09/10/02 100 %
APPLICANT COUNTY
New York City, Board of Education New York
LOCATION LATITUDE LONGITUDE
411 Pearl Street, NY, NY 10038 N/A N/A
DAMAGE DESCRIPTION AND DIMENSIONS
The collapse of ths World Trade Centers (WTC) on September 11,2001 caused a massive cloud of pulverized conaete and dust to impact neighboring
buildings blocks away from the World Trade Center complex. The Murry Bergtraum High School for Business Carriers (M520) is located at 411 Peart
Street, approximately 2000 feet from the Ground Zero disaster area. The dust cloud from the collapse of the WTC buildings directly impacted the schoo
and covered the building with a layer of dust. The New York City Board of Education contracted ATC Associates to perform indoor air quality
assessments and air monitoring services, as well as water quality testing to ensure that the air and water quality was acceptable for the re-occupancy of
students and staff.
SCOPE OF WORK
Work complete consisted of the expenses incurred by the New York City Board of Education (BoE) for the work performed by ATC Associates, a
contractor to BoE at Murry High School, The total eligible work is a compilation of two invoices (that are attached to this project worksheet). These
include:
Payment #4 include technical services costs and sample analyses costs to conduct air quality testing In November 01, as indicated on invoice. Actual
labor was performed between November 13 to 18,2001. The total eligible contract cost for Payment #4 was $20,620.00.
Payment #16 include technical services costs, equipment costs and sample analyses costs to conduct air quality testing from November 01 to March
02, as indicated on invoice. Actual labor was performed between November 15-19, 2001. The total eligible contract cost for Payment #16 was
$5,337.50.
Payment #30 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from July 01 to September 10,
2002. The total eligible contract cost for Payment #30 was $15,133.50.
Total eligible contract cost for this project worksheet is $41,091.00.
Does the Scope of Work change the pre-disaster condition at site? □ Yes [g No
Special Consideration issues included? [g Yes □ No Hazard Mitigation proposal included? □ Yes (3
Is there insurance coverage on facility? □ Yes [7] No
PROJECT COST
ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST
Work Complete_______________
1 9003 ATC Contract 1 / LS $ 41,091.00 $ 41,091.00
/ LS $ $
I LS $ $
/ LS $_____ -
Total
r$ 41,091.00
PREPARED BY: Olivia Szabo REMARKS: Project Officer
FEMA Form 90-91, SEP 98
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_003503783
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000243518
OCR can misread numbers and units. Confirm readings against the page image before using them.