NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 9 pages

OEM Project Worksheet Obligation Form

Machine-extracted title · confidence 26%

Mayor's OEM/OMB form approving PW obligation; notes on funding and extensions.

NYC-WTC_000243517–000243525
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001

PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid 0MB control number is displayed in the upper right corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collection Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 061-51000-22 03/17/03 B DAMAGE FACILITY WORK COMPLETE AS OF; Air Quality Testing_____________ 09/10/02 100 % APPLICANT COUNTY New York City, Board of Education New York LOCATION LATITUDE LONGITUDE 411 Pearl Street, NY, NY 10038 N/A N/A DAMAGE DESCRIPTION AND DIMENSIONS The collapse of ths World Trade Centers (WTC) on September 11,2001 caused a massive cloud of pulverized conaete and dust to impact neighboring buildings blocks away from the World Trade Center complex. The Murry Bergtraum High School for Business Carriers (M520) is located at 411 Peart Street, approximately 2000 feet from the Ground Zero disaster area. The dust cloud from the collapse of the WTC buildings directly impacted the schoo and covered the building with a layer of dust. The New York City Board of Education contracted ATC Associates to perform indoor air quality assessments and air monitoring services, as well as water quality testing to ensure that the air and water quality was acceptable for the re-occupancy of students and staff.

SCOPE OF WORK Work complete consisted of the expenses incurred by the New York City Board of Education (BoE) for the work performed by ATC Associates, a contractor to BoE at Murry High School, The total eligible work is a compilation of two invoices (that are attached to this project worksheet). These include: Payment #4 include technical services costs and sample analyses costs to conduct air quality testing In November 01, as indicated on invoice. Actual labor was performed between November 13 to 18,2001. The total eligible contract cost for Payment #4 was $20,620.00.

Payment #16 include technical services costs, equipment costs and sample analyses costs to conduct air quality testing from November 01 to March 02, as indicated on invoice. Actual labor was performed between November 15-19, 2001. The total eligible contract cost for Payment #16 was $5,337.50.

Payment #30 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from July 01 to September 10, 2002. The total eligible contract cost for Payment #30 was $15,133.50.

Total eligible contract cost for this project worksheet is $41,091.00. Does the Scope of Work change the pre-disaster condition at site? □ Yes [g No Special Consideration issues included? [g Yes □ No Hazard Mitigation proposal included? □ Yes (3 Is there insurance coverage on facility? □ Yes [7] No PROJECT COST ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST Work Complete_______________ 1 9003 ATC Contract 1 / LS $ 41,091.00 $ 41,091.00 / LS $ $ I LS $ $ / LS $_____ - Total r$ 41,091.00 PREPARED BY: Olivia Szabo REMARKS: Project Officer

FEMA Form 90-91, SEP 98

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_003503783 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000243518

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243518Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411651

Narrative on air and dust testing at PS 833; funding and reimbursement notes.

Similar indexed content

Compare copies and versions →