NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Project Worksheet Form, FEMA 3067-0151

Machine-extracted title · confidence 31%

OMB-disclosure project worksheet for FEMA disaster-related activities.

NYC-WTC_000302292
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

axe -75^ FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001

PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid OMB control number is displayed in the upper right I corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collection Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 12B 061-51000-33 06/04/02 B DAMAGE FACILITY WORK COMPLETE AS OF: Air Monitoring and Testing 11/09/01 100 % APPLICANT COUNTY New York City Housing Preservation and Development New York LOCATION LATITUDE I LONGITUDE 100 Gold Street, New York, NY 10038 DAMAGE DESCRIPTION AND DIMENSIONS The collapse Of the World Trade Center (WTC) on September 11, 2001 caused a massive cloud of pulverized concrete and dust to impact buildings adjacent to and blocks away from the WTC complex. The affected building of New York City Housing Preservation and Development (HPD) is located at 100 Gold Street, approximately four (4) blocks away.

The dust cloud from the collapse of the WTC covered the building at 100 Gold Street with a layer of pulverized debris. The debris and the apparent shock wave from the collapse damaged the air intake fan on top of the building allowing the dust to enter the fan chamber and insulation. In addition, dust and debris clogged external filters and louvers, thereby creating significant ventilation problems. The ventilation system then carried the dust and pulverized debris throughout the building. Also, the lobby of the building as utilized as a relief center for displaced citizens and rescue personnel working at the WTC disaster site. The people using the relief! center brought additional dust and debris into the building. The dust and debris that impacted the building was possibly contaminated with asbestos and other hazardous materials and therefore, required environmental testing. SCOPE OF WORK Work complete consists of the contractual work performed by Consulting & Testing Services, Inc. (CTSI) for additional indoor air quality testing afte r complaints by HPD employees of a possible hazardous workplace following the initial building and ventilation cleanup/repair and indoor air quality testing following the events of September 11, 2001. The costs incurred by CTSI for work covered by this project worksheet total $8,750. CTSI tested for the following parameters during the seven visits to 100 Gold Street: Carbon Monoxide, Carbon Dioxide, Relative Humidity, Temperature, Total Particulate and Volatile Organic Compounds (VOC's). The testing consisted of technicians using hand held test devices to collect air samples and having a laboratory analyze the samples. The indoor air quality testing was performed between 10/05/01 and 11/08/01. The total eligible costs incurred by HPD for work indoor air quality testing and analysis performed by CTSI totals $8,750.

Does the Scope of Work change the pre-disaster condition at site? EH Yes eg No Special Consideration issues included? Yes □ No Hazard Mitigation proposal included? | | Yes No Is there insurance coverage on facility? [X] Yes □ No PROJECT COST ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 9003 Contract - Consulting and Testing Services, Inc. 1 / LS $8,750 8,750.00 1 (invoice for additional testing) / $ / $ / $ / $ ______________ . ____________ i ! Total $ 8,750.00 I PREPARED BY: Mark A. Foreman REMARKS: Project Officer

FEMA Form 90-91, SEP 98

CITY_2IMCl00_001695489 NYC-WTC_000302292

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302292Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279700

FEMA project worksheet for PS 234 school cleanup costs and scope; disaster 1391.

Similar indexed content

Compare copies and versions →